Shikhar Kiaan is an approved mixed-use project in Amiyapur, Gandhinagar, Gujarat. It plans 137 units in 3 towers of up to 16 floors on 1.5 acres. Its stated project cost is ₹124.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Aug 2024).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Shikhar Kiaan?

Shikhar Kiaan is an approved mixed-use project in Amiyapur, Gandhinagar, Gujarat. It plans 137 units in 3 towers of up to 16 floors on 1.5 acres.

Who is building it?

The applicant is Tapovan Infracon.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 10 Aug 2024), as of 27 Nov 2026.

Where is it?

In Amiyapur, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹124.6 crore and a site of 1.5 acres.

When was it filed?

The application was filed on 8 May 2024.

Project details

StatusEnvironmental approval granted
Status since10 Aug 2024
Application filed8 May 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantTapovan Infracon
UseMixed use
Units137
Towers3
Floors (tallest)16
Basements3
Parking spaces451
Land area1.5 acres (0.6 ha)
Built-up area46,962 m² (5,05,494 sq ft)
Plot area5,855 m² (63,023 sq ft)
Project cost₹124.6 crore
Village / localityAmiyapur
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-03304

What the filings say

What is planned

Tapovan Infracon proposes the construction of Shikhar Kiaan, a mixed-use residential and commercial development in Amiyapur, Gandhinagar. The applicant's project report describes a complex consisting of three blocks—A, B, and C—each rising to a height of Ground plus 16 floors, supported by two levels of basement parking.

The project is designed to accommodate a total of 124 residential units and 15 commercial shops. Block A and Block B are integrated structures containing the commercial component and 60 residential units. Block C is a standalone residential building containing 64 units.

ItemDetail
Total Residential Units124
Total Commercial Shops15
Building HeightGround + 16 Floors
Basement Levels2 (Parking)
Sewage Treatment Plant Capacity150 Kilolitres per Day (KLD)
Organic Waste Converter Capacity350 kg/day
Solar Power Installation78.64 KW
Planned Greenbelt Trees147

Layout and design

According to the master plan, the ground floor of Block A and B features five shops, a society common amenity room, and an electrical meter room. The first and second floors of these blocks continue the commercial use with five shops each, alongside residential units. From the third floor to the 16th floor, the blocks are dedicated entirely to residential use.

Block C is designed with a ground floor dedicated to society amenities and parking, with residential units starting from the first floor. The site layout maintains an 8.00-metre wide clear margin on all sides of the buildings to ensure fire tender movement and open space. A 6.10-metre wide ramp provides access to the two basement levels, which are designated for resident and visitor parking.

Water, power and access

During the construction phase, water will be sourced from local tanker suppliers. For the operational phase, the applicant intends to obtain water from the Gandhinagar Municipal Corporation (GMC). The total water demand will be managed through water-efficient fixtures, including diffused taps and twin flushing systems.

Power will be supplied by the state grid, with back-up provided by Diesel Generator (DG) sets equipped with acoustic enclosures to mitigate noise. The project includes a significant renewable energy component, with 78.64 KW of rooftop solar panels planned for installation on the terrace areas. The site is accessible via a 9.00-metre wide Town Planning Scheme (TPS) road, which connects to a larger 90.00-metre wide TPS road.

Environmental safeguards

The applicant has proposed an Environmental Management Plan (EMP) with a capital budget of ₹4.93 crore. A 150 KLD Sewage Treatment Plant using the Activated Sludge Process will be installed on-site. Treated water will be reused for gardening and flushing to reduce fresh water consumption.

For solid waste, the project will segregate dry and wet waste. An automatic Organic Waste Converter with a capacity of 350 kg/day will process wet waste into compost for use in the project's greenbelt. The greenbelt itself will cover 0.59 hectares (1.46 acres) and include 147 trees. To manage stormwater, two rainwater harvesting recharge wells are planned. During construction, dust mitigation measures will include 10-metre high wind-breakers, water sprinkling, and tarpaulin covers for material transport.

Shikhar Kiaan site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Shikhar Kiaan: Site layout: Block A, B, and C with 8m margins and internal roads (preview)🔒 Sign in free to see it
Site layout: Block A, B, and C with 8m margins and internal roads
Shikhar Kiaan: Ground and First Floor Plan: Block A and B commercial and residential layout (preview)🔒 Sign in free to see it
Ground and First Floor Plan: Block A and B commercial and residential layout
Shikhar Kiaan: Ground and Typical Floor Plan: Block C residential units and parking (preview)🔒 Sign in free to see it
Ground and Typical Floor Plan: Block C residential units and parking
Shikhar Kiaan: Terrace plan: Solar panel locations and water tank details (preview)🔒 Sign in free to see it
Terrace plan: Solar panel locations and water tank details

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.5 acres, this one is larger than 53% of them.

134 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Amiyapur, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.