One of 2 filings for this project. The project's main page, with every filing and where each stands: Rethal Greens
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Apr 2026 |
| Application filed | 5 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Safal Constructions (India) Private Limited |
| Use | Township |
| Units | 1,450 |
| Floors (tallest) | 2 |
| Height | 8 m |
| Parking spaces | 992 |
| Land area | 226.3 acres (91.6 ha) |
| Built-up area | 26,710 m² (2,87,504 sq ft) |
| Plot area | 9,15,768 m² (98,57,235 sq ft) |
| Project cost | ₹119 crore |
| Village / locality | Rethal |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-03516 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Mar 2026 | Environmental approval granted | 226.3 acres | ₹119 crore |
| Early planning filed 5 Jul 2024 (this page) | Cleared for impact study | 226.3 acres | ₹119 crore |
What the filings say
What is planned
Safal Constructions (India) Private Limited proposes to develop Rethal Greens, a weekend home township and area development project. The project is a joint venture between the applicant (52% share) and other parties including Infinity Infra Projects Private Limited and several individuals (48% share).
The project is designed as a residential plotting scheme where the developer intends only to sell individual plots. According to the project report, no house construction will be performed by the developer. The total built-up area is planned at 26,710 square metres, which includes 1,450 residential units, a club house, and a community hall. The buildings are designed with a maximum height of 8.0 metres (Ground + 1 floor).
Project Components
| Item | Detail |
|---|---|
| Total Plot Area | 91.5768 hectares (226.29 acres) |
| Total Built-up Area | 26,710 square metres |
| Residential Units | 1,450 plots |
| Commercial/Amenities | Club House, Community Hall, Restaurant |
| Maximum Building Height | 8.0 metres |
| Total Population | 9,856 (7,040 residents, 2,816 visitors) |
| Power Demand | 5,315 KVA |
Layout and design
The project has been planned in four phases. Phase I (75.35 hectares) was approved in 2012, Phase II (1.26 hectares) in 2015, and Phase III (4.18 hectares) in 2018. Phase IV (10.78 hectares) was submitted for approval in 2024.
Parking for each residential unit is designated within its individual plot area. For visitors, a total parking area of 13,643.33 square metres is proposed across various common plots in all four phases. The internal road network includes a 12.0-metre peripheral margin and 7.5-metre margins between blocks. While a tar road has been contracted for access to the club house, other internal roads are currently planned as kutcha roads for plot accessibility and landscape maintenance.
Land and surroundings
The project site is located at Rethal village in Sanand Taluka, Ahmadabad, situated on State Highway 135 (Sanand–Nalsarovar road). The Rethal village settlement is approximately 1.006 km from the site.
Environmental sensitive features include the Nalsarovar Canal at 5.634 km and the Nalsarovar Bird Sanctuary (a Ramsar site) at 11.389 km. The sanctuary's Eco-Sensitive Zone (ESZ) is 7.051 km from the project boundary. The applicant states that as of early 2024, no houses have been constructed, though a club house of 1,902.67 square metres is complete and serves as a sales office. The site currently contains over 4,664 planted trees and approximately 1,900 self-grown trees.
Water, power and access
During the operational phase, the total water requirement is estimated at 993 KLD, of which 648 KLD will be fresh water. Initially, water will be sourced through private tankers, with future plans to apply to the Narmada, Water Resources, Water Supply and Kalpsar Department for fresh water supply.
Power will be supplied by Uttar Gujarat Vij Company Ltd. with a maximum demand of 5,315 KVA. A 160 KVA diesel generator set is proposed for backup. Solar power is intended to meet 1.0% of the total demand (55 KVA).
Environmental safeguards
A Sewage Treatment Plant (STP) with a capacity of 815 KLD is proposed. Treated wastewater (approximately 636 KLD) will be recycled for horticulture, flushing, road washing, and generator cooling to achieve zero liquid discharge. A dual plumbing system will be adopted.
For storm water management, the plan includes 110 percolation wells and 11 lakes/ponds. Solid waste generation is estimated at 3,600 kg per day. Biodegradable waste (1,800 kg/day) will be processed in an organic waste converter to produce manure, while recyclable waste will be sold to vendors. The greenbelt development plan covers 1,86,560 square metres (20% of the plot area), featuring species such as Neem, Bamboo, and Indian Beech.
Timeline
The project was initially submitted for approval before 2015 but was delayed due to various factors including demonetisation and the COVID-19 pandemic. The applicant decided to revive the project in 2024. Construction of the club house is already complete, while the development of the 1,450 plots is pending environmental clearance.
Rethal Greens site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 226.3 acres, this one is larger than 97% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rethal, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rethal Greens — environmental approval granted, 150 m away
- Diversion of 53.3663 Ha of Protected Forest Land for Widening and… — under wildlife review, 4.4 km away
- Diversion of 53.3663 Ha of Protected Forest Land for Widening and… — lapsed, 4.4 km away
- Permission for laying of Optical Fiber Cable on (1) SH-17 from Sanand Police… — more information requested, 5.1 km away
- Arvind Everland — environmental approval granted, 9.3 km away
- Arvind Everland — cleared for impact study, 9.3 km away
- Forest Trails — environmental approval granted, 11.7 km away
- Forest Trails — cleared for impact study, 11.7 km away
More from Safal Constructions (India) Private Limited in Ahmadabad
- Niwa-2 Project — environmental approval granted
- Niwa Project — environmental approval granted
All 4 Safal Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.