One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Greenfield Project for Synthetic Organic & other Chemicals based on Chlorine at…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jul 2024 |
| Application filed | 8 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Dcm Shriram Limited |
| Land area | 14.4 acres (5.8 ha) |
| Project cost | ₹790 crore |
| Village / locality | Fulwadi |
| Taluk / tehsil | Jhagadia |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03572 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jan 2024 (this page) | Environmental approval granted | 14.4 acres | ₹790 crore |
| Early planning filed 3 May 2023 | Cleared for impact study | 14.4 acres | ₹790 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 14.4 acres, this one is larger than 72% of them.
146 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Fulwadi, Jhagadia, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield Project for Synthetic Organic & other Chemicals based on… — cleared for impact study, 0 m away
- Sumati Spintex Solar Project at Talodra — lapsed, 200 m away
- EIA Report for Proposed Expansion of Polymer Grade Product at Plot No. 916,… — environmental approval granted, 550 m away
- P751-DGVCL cable laying ROU — forest land use approved, 550 m away
- Valiant Organics Limited (Unit-1) — environmental approval granted, 600 m away
- Solar Power Ground Mounted Solar Panel Project at Selod, Taluka Jhagadia,… — forest land use approved, 750 m away
- Project by Valiant Organics Limited — initial checks, 750 m away
- Industrial project by Valiant Organics Limited — environmental approval granted, 750 m away
All 5 Dcm Shriram projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.