One of 2 filings for this project. The project's main page, with every filing and where each stands: Ec Amendment for Change in Mode of Disposal of Effluent for M/S. Suleshvari Healthcare
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 23 Dec 2024 |
| Application filed | 25 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Suleshvari Healthcare |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹5 crore |
| Village / locality | Gadkhol |
| Taluk / tehsil | Anklesvar |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03884 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 8 May 2026 | Environmental approval granted | 5.2 acres | ₹5 crore |
| Amendment filed 25 Nov 2024 (this page) | Returned to applicant | 5.2 acres | ₹5 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.2 acres, this one is larger than 56% of them.
292 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gadkhol, Anklesvar, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ec Amendment for Change in Mode of Disposal of Effluent for M/S. Suleshvari… — environmental approval granted, 0 m away
- Shree Sulphurics Pvt. Ltd., Unit-2 — initial checks, 150 m away
- The Proposed Proposal Is for Expansion in Existing Plant Capacity (Non-Ec… — cleared for impact study, 250 m away
- Proposed Integrated Paint Manufacturing Facility by M/s. Asian Paints Limited — environmental approval granted, 300 m away
- Proposed Integrated Paint Manufacturing Facility by M/s. Asian Paints Limited — cleared for impact study, 300 m away
- Industrial project by M/s. Atul Limited — lapsed, 450 m away
- Industrial project by M/s. Atul Limited — cleared for impact study, 450 m away
- Industrial project by M/s. Atul Limited (Aromatics Business) — cleared for impact study, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.