Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Jul 2024 |
| Application filed | 20 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shiv Developers |
| Use | Residential |
| Units | 182 |
| Towers | 4 |
| Floors (tallest) | 13 |
| Basements | 2 |
| Parking spaces | 283 |
| Land area | 1.3 acres (0.5 ha) |
| Built-up area | 37,200 m² (4,00,417 sq ft) |
| Plot area | 5,375 m² (57,856 sq ft) |
| Project cost | ₹70 crore |
| Village / locality | Bilasiya |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03947 |
What the filings say
What is planned
Shiv Developers proposes the construction of a residential project named Atharva Parisar in Bilasiya, Ahmedabad. The applicant's project report states that the development will consist of four blocks (Blocks A, B, C, and D) with two levels of basements, a ground floor, and 13 upper floors.
The project is designed to house 182 residential units. According to the area statement, the total built-up area is 37,199.91 square metres, with a total Floor Space Index (FSI) area of 21,487.96 square metres. The residential units are planned as 3 BHK flats.
Layout and design
The site layout includes a 7.50-metre-wide approach road and internal pathways ranging from 2.55 metres to 3.37 metres in width. A common plot of 550.60 square metres is designated within the site. The building design incorporates earthquake-resistant structures as per relevant Indian Standard codes.
Vertical movement will be facilitated by multiple lifts, including dedicated fire lifts in each block. The ground floor and two basement levels are primarily dedicated to parking and services. The project also includes a roof-top solar installation with a required capacity of 27.30 kW, calculated as 5% of the total connected load of 546 kW.
| Item | Detail |
|---|---|
| Total Plot Area | 5,374.55 square metres |
| Total Built-up Area | 37,199.91 square metres |
| Total FSI Area | 21,487.96 square metres |
| Residential Units | 182 (3 BHK) |
| Building Configuration | 2 Basements + Ground + 13 Floors |
| Total Parking Area | 8,836.38 square metres |
| Greenbelt Area | 811.00 square metres |
| Estimated Steel Requirement | 1,400 MT |
| Estimated Cement Requirement | 1,25,000 Bags |
Land and surroundings
The project is located on 0.54 hectares (1.33 acres) of open land in Bilasiya village, Daskroi Taluka. The site is situated within the limits of the Ahmedabad Urban Development Authority (AUDA). The nearest railway station is Naroda, approximately 3.20 km away, and Ahmedabad Airport is about 7.00 km from the site. The applicant states that the land is currently open and not used for agriculture.
Water, power and access
During the operational phase, the total water requirement is estimated at 183 kilolitres per day (KLD). Fresh water demand is projected at 120 KLD, to be sourced from AUDA (Narmada water). The applicant intends to use treated wastewater for flushing (60 KLD) and gardening (3 KLD).
Power will be sourced from Uttar Gujarat Vij Company Limited (UGVCL). The construction phase will require approximately 30 kW, while the operational phase demand is estimated at 2.00 MW. A diesel generator (DG) set is planned for emergency backup. Access to the site is provided via an 18.00-metre-wide Town Planning Scheme (TPS) road.
Environmental safeguards
The project includes a Sewage Treatment Plant (STP) with a capacity of 90,500 litres per day (90.5 KLD). Treated water will be reused for flushing and gardening, with the excess discharged into the AUDA drainage network. For solid waste, the applicant proposes an in-house Organic Waste Converter (OWC) to process approximately 300 kg/day of wet biodegradable waste into manure. Dry waste (246 kg/day) will be collected by AUDA.
Rainwater harvesting will be managed through two percolation wells to recharge ground aquifers. The greenbelt will cover 811 square metres, comprising 260 square metres of tree cover and 550.60 square metres of lawn. The applicant plans to plant 135 trees. Energy conservation measures include the use of LED lighting for common areas, solar street lights, and non-reflective glass to minimize heat island effects.
Parking
The project provides a total parking area of 8,836.38 square metres, which exceeds the 4,297.59 square metres required under General Development Control Regulations (GDCR). This space is distributed across the ground floor hollow plinth (1,620.81 square metres), the first basement (3,487.28 square metres), and the second basement (3,728.29 square metres). The layout provides for 283 Car Parking Spaces (CPS).
Atharva Parisar site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 63% of them.
237 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bilasiya, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Virasat — environmental approval granted, 50 m away
- Virasat — environmental approval granted, 50 m away
- Oscar Island — environmental approval granted, 50 m away
- Virasat — environmental approval granted, 50 m away
- Anant Sky — environmental approval granted, 100 m away
- Diversion of 0.70 Ha of forest land — more information requested, 150 m away
- Shubh Labh Heights — environmental approval granted, 300 m away
- Oscar Belmont — initial checks, 350 m away
More from Shiv Developers in Ahmadabad
- Swagatam Elenza — environmental approval granted
All 5 Shiv Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.