One of 2 filings for this project. The project's main page, with every filing and where each stands: Project by Crystal Crop Protection Ltd.
Project details
| Status | Initial checks |
|---|---|
| Status since | 3 Aug 2024 |
| Application filed | 3 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Other |
| Applicant | Crystal Crop Protection PVT LTD |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹109.6 crore |
| Village / locality | Dahej |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04069 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Apr 2026 | Initial checks | 7.4 acres | |
| New project filed 3 Aug 2024 (this page) | Initial checks | 7.4 acres | ₹109.6 crore |
In context
177 applications in Bharuch since January 2022 are in the same category (Other): 2 approved, 174 filed or under review, and 1 withdrawn, lapsed or rejected. At 7.4 acres, this one is larger than 52% of them.
322 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dahej, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project by Crystal Crop Protection Ltd. — initial checks, 0 m away
- No increase in Pollution load application for agro chemicals unit of M/s.… — initial checks, 300 m away
- No Increase in Pollution Load Application for manufacturing of various… — initial checks, 400 m away
- Amendment in the Existing Ec for the Manufacturing of Synthetic Organic… — environmental approval granted, 400 m away
- Proposed Change in Product Mix for the Manufacturing of Synthetic Organic… — initial checks, 400 m away
- Industrial project by Pukhraj Additives LLP — under environmental review, 450 m away
- Industrial project by Pukhraj Additives LLP — cleared for impact study, 450 m away
- Mendas Pharmacuticals — returned to applicant, 450 m away
All 4 Crystal Crop Protection projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.