Quick answers
What is this project?
M/s. Giriraj Construction Reapprasial-Area 2.00.00 Village – Nikava, Taluka- Kalavad, Dist-Jamnagar (Gujarat) is an approved mining project in Nikava, Kalavad, Jamnagar, Gujarat. The site covers 4.9 acres.
Who is building it?
The applicant is Jesadiya Girdharlal Virji.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Dec 2024), as of 27 Nov 2026.
Where is it?
In Nikava, Kalavad, Jamnagar, Gujarat.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 5 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Dec 2024 |
| Application filed | 5 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jesadiya Girdharlal Virji |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Nikava |
| Taluk / tehsil | Kalavad |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04120 |
In context
201 applications in Jamnagar since January 2022 are in the same category (Mining): 141 approved, 28 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is larger than 59% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Nikava, Kalavad, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/S Avyakt Stone (Re-Appraisal) Lease Area-4.00.00 Ha. Vill:… — environmental approval granted, 4 km away
- Diversion of 29.025 Ha. Road Side Linear Pf Land for Widening and Strengthning… — more information requested, 5.9 km away
- Diversion of 14.8433 Ha of Protected Forest Land for Widening and… — lapsed, 8.4 km away
- Drinking Water Pipeline in Vil:balambhadi — lapsed, 13.8 km away
- Drinking Water Pipeline for Dipakbhai Gamdha — lapsed, 13.8 km away
- Laying UG OFC Cable in Kalavad taluka of Jamnagar dist. — more information requested, 20.3 km away
- Shri Mukesh Mansukhlal Maheta — lapsed, 22.8 km away
- Shri BharatBhai Dhanjibhai Thesiya — environmental approval granted, 23.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.