Project details
| Status | Not approved |
|---|---|
| Status since | 15 Mar 2025 |
| Application filed | 23 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Patel Dhavalkumar Dashrathlal |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Khodamali |
| Taluk / tehsil | Satlasana |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04176 |
In context
130 applications in Mahesana since January 2022 are in the same category (Mining): 85 approved, 12 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is smaller than 69% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 14.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Khodamali, Satlasana, Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mr. Girdharbhai Ramjibhai Sorathiya — environmental approval granted, 100 m away
- Mining project by M/s Shah Engineering Company — not approved, 150 m away
- Saraswati Materials Suppliers (1.96.96 Ha) — environmental approval granted, 500 m away
- Saraswati Materials Suppliers — environmental approval granted, 1.1 km away
- Hadol Granite Mining Project, Survey No. 345 Paiki, QL No. AGM/QL/491,… — environmental approval granted, 1.4 km away
- Rajpur Building Stone Mine Survey No. 13 Paiki PNT — environmental approval granted, 3.1 km away
- Rajpur Building Stone Mine Survey No 13 Paiki_DA — not approved, 3.2 km away
- Augmentation of Rising main pipeline, Construction of Inspection Bunglow and… — forest land use approved, 3.9 km away
More from Patel Dhavalkumar Dashrathlal in Mahesana
- Mr. Girdharbhai Ramjibhai Sorathiya — environmental approval granted
- Mining project by M/s Shah Engineering Company — not approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.