LapsedPower · Gir Somnath, Gujarat

Transfer of Environment Clearance of 90 MW Captive Thermal Power Plant from M/s Gujarat Ambuja Cements Limited to M/s Ambuja Cements Limited

Transfer of Environment Clearance of 90 MW Captive Thermal Power Plant from M/s Gujarat Ambuja Cements Limited to M/s Ambuja Cements Limited is a lapsed power project in Vadnagar, Kodinar, Gir Somnath, Gujarat. The site covers 11.9 acres. Its stated project cost is ₹358.6 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Gir Somnath

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleTransfer of Environment Clearance of 90 MW Captive Thermal Power Plant from M/s Gujarat Ambuja Cements Limited to M/s Ambuja Cements Limited at located Village: Ambujanagar, Taluka- Kodinar, District – Gir-Somanath, Gujarat
StatusLapsed
Status since29 Oct 2024
Application filed29 Apr 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorPower
ApplicantAmbuja Cements Limited
Land area11.9 acres (4.8 ha)
Project cost₹358.6 crore
Village / localityVadnagar
Taluk / tehsilKodinar
DistrictGir Somnath
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-04218

In context

17 applications in Gir Somnath since January 2022 are in the same category (Power): 3 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. At 11.9 acres, this one is larger than 93% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vadnagar, Kodinar, Gir Somnath, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ambuja Cements Limited in Gir Somnath

6 Ambuja Cements projects in Gir Somnath
All 87 Ambuja Cements projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.