What is Developing? Open the mapMap

Cleared for impact studyIndustry · Kachchh, Gujarat

Production Capacity Expansion by 20% of Existing Production Capacity Within the Existing Plant Facility for Manufacturing of Synthetic Organic Chemicals (I.E. Dyes & Dye Intermediates, Bulk Drugs and Intermediates Excluding Drug Formulation, Synthetic Rubbers, Basic Organic Chemicals, Other Synthetic Organic Chemicals and Chemical Intermediates) Located at Plot No. 1430/1, NH No. 8a, Village & Taluka Bhachau, District Kutch, Gujarat.

Production Capacity Expansion by 20% of Existing Production Capacity Within the Existing Plant Facility for Manufacturing of Synthetic Organic Chemicals (I.E. Dyes & Dye Intermediates, Bulk Drugs and Intermediates Excluding Drug Formulation, Synthetic Rubbers, Basic Organic Chemicals, Other Synthetic Organic Chemicals and Chemical Intermediates) Located at Plot No. 1430/1, NH No. 8a, Village & Taluka Bhachau, District Kutch, Gujarat is a proposed industrial project in Bhachau (M), Bhachau, Kachchh, Gujarat. The site covers 40 acres. Its stated project cost is ₹182.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Mar 2024).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Production Capacity Expansion by 20% of Existing Production Capacity Within the Existing Plant Facility for Manufacturing of Synthetic Organic Chemicals (I.E. Dyes & Dye Intermediates, Bulk Drugs and Intermediates Excluding Drug Formulation, Synthetic Rubbers, Basic Organic Chemicals, Other Synthetic Organic Chemicals and Chemical Intermediates) Located at Plot No. 1430/1, NH No. 8a, Village & Taluka Bhachau, District Kutch, Gujarat is a proposed industrial project in Bhachau (M), Bhachau, Kachchh, Gujarat. The site covers 40 acres.

Who is building it?

The applicant is Aarti Industries Limited (Anushakti Division).

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Mar 2024), as of 27 Nov 2026.

Where is it?

In Bhachau (M), Bhachau, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹182.4 crore and a site of 40 acres.

When was it filed?

The application was filed on 23 Feb 2024.

Project details

StatusCleared for impact study
Status since5 Mar 2024
Application filed23 Feb 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAarti Industries Limited (Anushakti Division)
Land area40 acres (16.2 ha)
Project cost₹182.4 crore
Village / localityBhachau (M)
Taluk / tehsilBhachau
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-04227

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is smaller than 54% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhachau (M), Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Aarti Industries Limited (Anushakti Division) in Kachchh

All 21 Aarti Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.