Quick answers
What is Joysar Kanaiya (Ajapar Dolerite Block- 1)?
Joysar Kanaiya (Ajapar Dolerite Block- 1) is a lapsed mining project in Ajapar, Mandvi, Kachchh, Gujarat. The site covers 2.8 acres.
Who is building it?
The applicant is Joysar Kanaiya.
Has it been approved?
No. The application was lapsed on 1 Apr 2025, so it is no longer under consideration.
Where is it?
In Ajapar, Mandvi, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹3.2 crore and a site of 2.8 acres.
When was it filed?
The application was filed on 12 Sept 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Apr 2025 |
| Application filed | 12 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Joysar Kanaiya |
| Land area | 2.8 acres (1.1 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Ajapar |
| Taluk / tehsil | Mandvi |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04265 |
In context
1,132 applications in Kachchh since January 2022 are in the same category (Mining): 683 approved, 276 filed or under review, and 173 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.8 acres, this one is smaller than 91% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Ajapar, Mandvi, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.1560 Ha. of Roadside Protected Forest for Construction of 33 KV… — forest land use approved, 4.8 km away
- Shri Ashapura Enterprise Pro. Dipubha Kalubha Rathod. — initial checks, 6.8 km away
- Shri Ashapura Enterprise Pro. Dipubha Kalubha Rathod. — cleared for impact study, 6.8 km away
- Laying of Drinking water pipeline parrallel to Mangawana Gadhashisha road,… — lapsed, 7.2 km away
- Diversion of Roadside Protected Forest Land for Laying Underground Drinking… — more information requested, 7.2 km away
- 66kV UG Cable laying work for 66kV Deshalpar to Manjal line under KSY-II with… — forest land use approved, 7.3 km away
- Shri Baradia Shankar Ramji. — environmental approval granted, 7.4 km away
- Shri Baradia Shankar Ramji. — cleared for impact study, 7.4 km away
More from Joysar Kanaiya in Kachchh
- Shri Joysar Kanaiya Hansraj — environmental approval granted
- Shri Joysar Kanaiya Hansraj — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.