Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Tremont Adleap

Tremont Adleap is an approved residential project in Chharodi, Daskroi, Ahmadabad, Gujarat. It plans 222 units in 1 tower of up to 32 floors on 1.6 acres. Its stated project cost is ₹103.7 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Dec 2024).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since11 Dec 2024
Application filed28 Jun 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantT S Projects
UseResidential
Units222
Towers1
Floors (tallest)32
Basements3
Height113 m
Parking spaces579
Land area1.6 acres (0.7 ha)
Built-up area72,794 m² (7,83,547 sq ft)
Plot area6,539 m² (70,385 sq ft)
Project cost₹103.7 crore
Village / localityChharodi
Taluk / tehsilDaskroi
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-04483

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 28 Jun 2024 (this page)Environmental approval granted1.6 acres₹103.7 crore
New project filed 8 Oct 2023Environmental approval granted1.6 acres₹103 crore

What the filings say

What is planned

T S PROJECTS is developing Tremont Adleap, a residential building project in Chharodi, Ahmadabad. According to the applicant's conceptual plan and environmental clearance documents, the project will consist of a single building with two blocks. The structure is designed for a three-level basement, a ground floor or hollow plinth, and 32 upper floors, reaching a total height of 112.70 metres.

The development is planned to house 222 residential units, comprising 112 four-BHK (bedroom, hall, and kitchen) apartments and 110 three-BHK apartments. The total built-up area is stated as 72,727.44 square metres.

Layout and design

The project layout includes a central building footprint surrounded by a fire tender route of 8.00 metres width. The ground floor layout features a 6.00-metre wide approach road, lift foyers for both blocks, and dedicated rooms for an electric substation, disaster surveillance, and a control room for security and building management.

Vertical circulation is provided through six lifts in each block, including one dedicated fire lift per block. Two staircases are planned for each block, with widths of 2.01 metres and 1.51 metres. The design incorporates refuge areas on the 6th, 10th, 14th, 18th, 22nd, 26th, and 30th floors, with a skip floor on the 20th level.

Water, power and access

The total water requirement during the operation phase is estimated at 240.13 kilolitres per day (KLD). Of this, 164.42 KLD will be fresh water sourced from the Ahmedabad Municipal Corporation (AMC), while 75.71 KLD will be met through treated sewage for flushing and gardening. During construction, water demand is limited to 17.5 KLD, to be supplied by tankers.

Power backup will be provided by a 500 kVA diesel generator set equipped with acoustic enclosures. The project also proposes 90 kW of solar power generation. Parking is planned across the three basement levels and the hollow plinth, providing a total of 579 car parking spaces (CPS). The applicant has committed to providing electric vehicle charging facilities for 20% of the total parking spaces.

Environmental safeguards

The applicant proposes to install an onsite Sewage Treatment Plant (STP) with a capacity of 225 KLD. Treated wastewater will be reused within the premises to the maximum extent possible, with any excess discharged into the AMC drainage line. For solid waste, an onsite organic waste converter will be used to treat biodegradable waste, while recyclable materials will be sold to vendors.

Stormwater management includes a drainage system and two percolation wells for groundwater recharge. The annual recharge of groundwater is estimated at approximately 2,900 cubic metres. A green belt area of 730.92 square metres (approximately 11% of the plot) is planned, featuring 164 trees of indigenous species. The environmental management budget is set at ₹107.5 lakh for capital costs and ₹13.5 lakh for annual recurring expenses.

Fire and safety

The fire protection system includes a hydrant system with an underground tank of 2,00,000 litres and a terrace tank of 20,000 litres. Other planned installations include:

Tremont Adleap site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Tremont Adleap: Ground floor layout: building blocks, fire tender route, and internal roads (preview)🔒 Sign in free to see it
Ground floor layout: building blocks, fire tender route, and internal roads
Tremont Adleap: Satellite view of project site and surrounding landmarks in Chharodi (preview)🔒 Sign in free to see it
Satellite view of project site and surrounding landmarks in Chharodi
Tremont Adleap: Rainwater harvesting scheme and recharge pit design (preview)🔒 Sign in free to see it
Rainwater harvesting scheme and recharge pit design
Tremont Adleap: Location map showing the site near Sarkhej-Gandhinagar Highway (preview)🔒 Sign in free to see it
Location map showing the site near Sarkhej-Gandhinagar Highway

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is larger than 51% of them.

169 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chharodi, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.