Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Jan 2025 |
| Application filed | 7 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Praveenchandra Ramanlal Jayswal |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Pataliya |
| Taluk / tehsil | Idar |
| District | Sabar Kantha |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04829 |
In context
226 applications in Sabar Kantha since January 2022 are in the same category (Mining): 124 approved, 37 filed or under review, and 65 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.7 acres, this one is smaller than 67% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 7.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Pataliya, Idar, Sabar Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Vijaysinh Jashvantsinh Rathod Mining of River bed ordinary sand from… — not approved, 200 m away
- Vinaysinh Baldevsinh Rathod (A Sand Lease Holder) — lapsed, 1.7 km away
- M/S Avkar Roadways C/O – Pradhyumansinh Bhairavsinh Rathod Mining of River bed… — initial checks, 3.8 km away
- M/S Avkar Roadways C/O – Pradhyumansinh Bhairavsinh Rathod Mining of River bed… — cleared for impact study, 3.8 km away
- Mr. Rathod Hitendrasinh Vijaysinh Mining of River bed ordinary sand from… — environmental approval granted, 4.1 km away
- Shri Manubhai Dhulabhai Thori — environmental approval granted, 5.2 km away
- Shri Natubhai Dhulabhai Thori. — environmental approval granted, 5.4 km away
- Shri Kabirlal Dhulabhai Thori — cleared for impact study, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.