One of 2 filings for this project. The project's main page, with every filing and where each stands: Environment Clearance for Construction of Mixed-Use Development Project by "ADANI…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Dec 2024 |
| Application filed | 15 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Adani Infrastructure and Developers Private Limited |
| Use | Mixed use |
| Units | 1,594 |
| Towers | 18 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 7,652 |
| Land area | 36.9 acres (14.9 ha) |
| Built-up area | 4,40,317 m² (47,39,528 sq ft) |
| Plot area | 1,49,205 m² (16,06,028 sq ft) |
| Project cost | ₹2,000 crore |
| Village / locality | Asarva |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04899 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Jul 2025 | Under environmental review | 36.9 acres | ₹2,000 crore |
| Early planning filed 15 Jun 2024 (this page) | Cleared for impact study | 36.9 acres | ₹2,000 crore |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 36.9 acres, this one is larger than 94% of them.
84 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Asarva, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for Construction of Mixed-Use Development Project by… — under environmental review, 0 m away
- Shrimati Shardaben Chimanlal Lalbhai Hospital — environmental approval granted, 700 m away
- Redevelopment of Integrated Group Housing Facility for Residential &… — environmental approval granted, 1.5 km away
- Pratishtha 2 — more information requested, 1.7 km away
- Gujarat Cancer Society (The Medical College, Hospital & Research Center) — lapsed, 1.7 km away
- Diamond Retail Space — lapsed, 1.9 km away
- Diamond Retail Space — environmental approval granted, 1.9 km away
- Diamond Retail Space — more information requested, 1.9 km away
More from Adani Infrastructure and Developers Private Limited in Ahmadabad
- ""Residential Development" at TPS 35 by Adani Infrastructure and Developers… — environmental approval granted
- Residential Development by Adani Infrastructure and Developers Private Limited — returned to applicant
4 Adani Realty projects in Ahmedabad
All 28 Adani Realty projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.