Quick answers
What is Shivant Arena?
Shivant Arena is an approved residential project in Na, Olpad, Surat, Gujarat. It plans 266 units in 5 towers of up to 14 floors on 1.2 acres.
Who is building it?
The applicant is Maruti Enterprise.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Dec 2024), as of 27 Nov 2026.
Where is it?
In Na, Olpad, Surat, Gujarat.
How big is it?
It has a stated cost of ₹43.2 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 25 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Dec 2024 |
| Application filed | 25 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Maruti Enterprise |
| Use | Residential |
| Units | 266 |
| Towers | 5 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Parking spaces | 328 |
| Land area | 1.2 acres (0.5 ha) |
| Built-up area | 29,292 m² (3,15,296 sq ft) |
| Plot area | 4,948 m² (53,260 sq ft) |
| Project cost | ₹43.2 crore |
| Village / locality | Na |
| Taluk / tehsil | Olpad |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04997 |
What the filings say
What is planned
Shivant Arena is a proposed residential building project by Maruti Enterprise in Surat. The applicant's conceptual plan describes a development consisting of five residential buildings, designated as Blocks A, B, C, D, and E. Each building is planned to have two basement levels, a hollow plinth, and 14 upper floors.
The project will provide a total of 266 residential units. The total built-up area is 29,292.15 square metres, with a Floor Space Index (FSI) area of 17,749.20 square metres. Planned amenities include a children's play area, a garden with a jogging park, and a clubhouse for the society.
| Item | Detail |
|---|---|
| Total Plot Area | 4,948.00 sq. mt. (1.22 acres) |
| Total Built-up Area | 29,292.15 sq. mt. |
| Total Residential Units | 266 |
| Number of Buildings | 5 |
| Building Height | 44.81 m |
| Estimated Project Cost | ₹43.23 crore |
Layout and design
The five blocks are arranged around a central common plot (COP) of 495.01 square metres. Blocks A and D are identical in design, as are Blocks B and C. Block E has a smaller footprint compared to the others.
Parking is distributed across the two basement levels, the hollow plinth, and open surface areas. The applicant proposes a total of 328 Equivalent Car Spaces (ECS), which exceeds the statutory requirement of 266 spaces. This includes 272 spaces in the basement and 56 in the hollow plinth. Additionally, 66 visitor parking spaces are planned.
Land and surroundings
The project site is located at Block No. 95/A, O.P. No. 87, F.P. No. 87/Sub Plot No. 2, in the Sarthana-Pasodara-Laskana Town Planning Scheme. The land is classified as private residential land. The site is approximately 8.30 km from Surat railway station and 21.84 km from Surat airport. The applicant states that no national parks or wildlife sanctuaries are located within a 10 km radius.
Water, power and access
Water for the project will be supplied by the Surat Municipal Corporation (SMC). During the operation phase, total water consumption is estimated at 189 kilolitres per day (KLD). This includes 112 KLD of fresh water and 77 KLD of recycled water for flushing and gardening. A sewage treatment plant (STP) with a capacity of 180 KLD using Moving Bed Biofilm Reactor (MBBR) technology will be installed to treat 149 KLD of generated sewage.
The electrical load demand is estimated at 1,400 KW, to be sourced from Dakshin Gujarat Vij Company Limited (DGVCL). For emergency backup, three diesel generator sets of 125 KVA each will be installed. The project also incorporates solar power, with 259 solar panels planned to generate 140 KW for common area lighting and water pumps. Access to the site is provided via a 24-metre wide road.
Environmental safeguards
The applicant plans to develop a green belt covering 550 square metres, which is approximately 11% of the plot area. This will include the planting of 124 large trees such as Gulmohar, Jambu, and Limdo.
Solid waste management will involve an on-site organic waste convertor (OWC) with a capacity of 200 kg/day to process 319 kg/day of wet waste into manure. Dry waste, estimated at 213 kg/day, will be collected in bins and disposed of through the SMC system. For rainwater harvesting, two recharge wells are proposed to recharge ground aquifers.
Energy conservation measures include the use of aerated blocks for walls, LED lighting in common areas, and roof-top thermal insulation to reduce heat gain. The project is designed to comply with Energy Conservation Building Code (ECBC) norms.
Shivant Arena site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 72% of them.
163 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Na, Olpad, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nilkanth Avenue — environmental approval granted, 150 m away
- Karunesh Flora — environmental approval granted, 200 m away
- Vishwa 99 — lapsed, 250 m away
- Vishwa 99 — environmental approval granted, 250 m away
- Iconic Shivant — environmental approval granted, 300 m away
- The Future Corner — environmental approval granted, 350 m away
- Shivant — environmental approval granted, 400 m away
- Pragati Arcelia — environmental approval granted, 400 m away
All 3 Maruti Enterprise projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.