Quick answers
What is this project?
Expansion in manufacturing plant of ' Synthetic Organic Chemicals' [API & Intermediates] at Plot No. 137-138, Silvassa Road, Phase II, GIDC Estate, Vapi, - 396195, Dist. Valsad, Gujarat - EC Transfer is an approved industrial project in Vapi, Valsad, Gujarat. The site covers 1.7 acres.
Who is building it?
The applicant is Jay Finechem Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Nov 2024), as of 27 Nov 2026.
Where is it?
In Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹3.2 crore and a site of 1.7 acres.
When was it filed?
The application was filed on 10 Apr 2024.
Project details
| Official title | Setting up of an Expansion in manufacturing plant of ' Synthetic Organic Chemicals' [API & Intermediates] at Plot No. 137-138, Silvassa Road, Phase II, GIDC Estate, Vapi, - 396195, Dist. Valsad, Gujarat - EC Transfer |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 Nov 2024 |
| Application filed | 10 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Jay Finechem Private Limited |
| Land area | 1.7 acres (0.7 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Vapi |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05091 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 10 Apr 2024 (this page) | Environmental approval granted | 1.7 acres | ₹3.2 crore |
| Ownership transfer filed 12 Jan 2024 | Withdrawn | 1.7 acres | ₹3.2 crore |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.7 acres, this one is larger than 50% of them.
223 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in manufacturing plant of ' Synthetic Organic Chemicals' [API &… — withdrawn, 0 m away
- Ideal Dye Chem Industries (Unit-1) — environmental approval granted, 50 m away
- Ideal Dye Chem Industries (Unit-1) — cleared for impact study, 50 m away
- Proposed Expansion Project for the Manufacturing of Dyes Intermediates by M/S.… — environmental approval granted, 350 m away
- Proposed Expansion Project for the Manufacturing of Dyes Intermediates by M/S.… — cleared for impact study, 350 m away
- Proposed Expansion Project for the Manufacturing of Dyes Intermediates by M/S.… — returned to applicant, 350 m away
- Ideal Dye Chem Industries (Unit-II) — environmental approval granted, 350 m away
- Ideal Dye Chem Industries (Unit-II) — cleared for impact study, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.