Quick answers
What is this project?
Proposed Expansion of Existing Manufacturing Facility of Synthetic Organic Chemicals (Dyes and Dyes Intermediates) by Increasing Manufacturing Capacity from 6 MT/Month to 200 MT/Month is an approved industrial project in Gabheni, Majura, Surat, Gujarat. The site covers 0.7 acres.
Who is building it?
The applicant is Panchsheel Intermediates.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Feb 2024), as of 27 Nov 2026.
Where is it?
In Gabheni, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹15.3 crore and a site of 0.7 acres.
When was it filed?
The application was filed on 9 Jan 2024.
Project details
| Official title | Proposed Expansion of Existing Manufacturing Facility of Synthetic Organic Chemicals (Dyes and Dyes Intermediates) by Increasing Manufacturing Capacity from 6 MT/Month to 200 MT/Month along with Addition of New Products |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 Feb 2024 |
| Application filed | 9 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Panchsheel Intermediates |
| Land area | 3,000 m² |
| Project cost | ₹15.3 crore |
| Village / locality | Gabheni |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05168 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 9 Jan 2024 (this page) | Environmental approval granted | 0.7 acres | ₹15.3 crore |
| Expansion filed 25 Oct 2023 | Returned to applicant | 0.7 acres | ₹15.3 crore |
| Early planning filed 16 Feb 2023 | Cleared for impact study | 0.7 acres | ₹15.3 crore |
In context
103 applications in Surat since January 2022 are in the same category (Industry): 59 approved, 29 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.7 acres, this one is smaller than 74% of them.
80 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gabheni, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Manufacturing Facility of Synthetic Organic… — returned to applicant, 0 m away
- Proposed Expansion of Existing Manufacturing Facility of Synthetic Organic… — cleared for impact study, 0 m away
- Anupam Rasayan India Limited (Unit-1) — lapsed, 200 m away
- Project by M/s. Anupam Rasayan India Ltd. (Unit - 6) — initial checks, 300 m away
- Industrial project by Colour Plus Organics Private Limited — environmental approval granted, 600 m away
- Industrial project by Colour Plus Organics Private Limited — returned to applicant, 600 m away
- Industrial project by Colour Plus Organics Private Limited — cleared for impact study, 600 m away
- M/s. Everest Intermediates proposed Product Mix with respect to No Increase in… — initial checks, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.