Quick answers
What is this project?
Dhrangadhra Sandstone Mining Project, Survey No. 1379 Paiky 1/ Paiky 2, proposed by Shri Jhala Parikshitsinh Dilipsinh is an approved mining project in Dhrangadhra (M), Dhrangadhra, Surendranagar, Gujarat. The site covers 2.5 acres.
Who is building it?
The applicant is Jhala Parikshitsinh Dilipsinh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Dec 2024), as of 27 Nov 2026.
Where is it?
In Dhrangadhra (M), Dhrangadhra, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹2.5 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 11 Jun 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Dec 2024 |
| Application filed | 11 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jhala Parikshitsinh Dilipsinh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Dhrangadhra (M) |
| Taluk / tehsil | Dhrangadhra |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05306 |
In context
271 applications in Surendranagar since January 2022 are in the same category (Mining): 107 approved, 59 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Dhrangadhra (M), Dhrangadhra, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Nagajan B. Parmar — cleared for impact study, 2.3 km away
- Shri Savjiyani Hemal S — cleared for impact study, 2.3 km away
- Shri Tejash Kirtibhai Sompura — not approved, 2.6 km away
- Shri Hiteshbhai Sukhdevbhai Trivedi — not approved, 2.7 km away
- Smt. Tejalben Hiteshbhai Trivedi — environmental approval granted, 2.9 km away
- (Diversion of 0.4547 ha.)Remodeling of Distribution Network of NCD-4 (GROUP 8)… — forest land use approved, 3.1 km away
- Devlopment of "Kabir Aashram" by Kabir Charitable Trust, Ishadra Ta.… — lapsed, 4 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — withdrawn, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.