Environmental approval grantedBuildings & townships · Vadodara, Gujarat

Royal Arcade

Royal Arcade is an approved mixed-use project in Tandalja, Vadodara Rural, Vadodara, Gujarat. It plans 253 units in 3 towers of up to 13 floors on 1.6 acres. Its stated project cost is ₹65.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 16 Dec 2024).

See it on the live map All projects in Vadodara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since16 Dec 2024
Application filed7 Feb 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRoyal Arcade Developers
UseMixed use
Units253
Towers3
Floors (tallest)13
Basements1
Height45 m
Parking spaces362
Land area1.6 acres (0.6 ha)
Built-up area24,432 m² (2,62,984 sq ft)
Plot area6,332 m² (68,157 sq ft)
Project cost₹65.1 crore
Village / localityTandalja
Taluk / tehsilVadodara Rural
DistrictVadodara
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-05463

What the filings say

What is planned

Royal Arcade Developers proposes a new residential-cum-commercial project in the Akota-Tandalja area of Vadodara. The applicant's project report describes a single building composed of three blocks, reaching a maximum height of 44 metres. The structure is designed with a basement, a ground floor/hollow plinth, and 13 upper floors.

The project will provide a total of 253 units, consisting of 130 residential flats and 123 commercial shops. The residential units are planned for blocks A and B, while block C is designated for commercial use. A clubhouse is included as a community facility.

ItemDetail
Plot Area6,332 square metres
Total Built-up Area24,432.31 square metres
FSI Area17,096.02 square metres
Ground Coverage2,393.95 square metres (37.79%)
Total Residential Units130 Flats
Total Commercial Units123 Shops
Maximum Height44.0 metres
Expected Population831 (585 residents, 246 commercial users)

Layout and design

The site layout features a central building footprint surrounded by internal roads and open spaces. A 6.0-metre wide internal road is planned around the building to ensure smooth circulation and fire tender access. The project includes two entry and exit points connected to adjacent 24-metre and 12-metre wide public roads.

Parking is distributed across three levels: a mechanical basement, the hollow plinth, and open surface areas. The total parking provision is 8,810.52 square metres, accommodating 298 Equivalent Car Spaces (ECS). This includes 211 ECS in the basement, 16 ECS in the hollow plinth, and 71 ECS in open parking areas. Additionally, 80 electric vehicle charging points are proposed.

Water, power and access

During the operational phase, the total water requirement is estimated at 98 kilolitres per day (KLD). Fresh water demand of 59 KLD will be met by the Vadodara Mahanagar Seva Sadan (VMSS). The remaining 39 KLD will be sourced from recycled treated wastewater for flushing (35 KLD) and gardening (5 KLD).

Power will be supplied by the Madhya Gujarat Vij Company Limited (MGVCL), with an expected demand of 1,600 kW. For emergency backup, two diesel generator sets of 125 kVA each are proposed. The project also plans to generate 80 kW of solar power through 147 rooftop panels.

Environmental safeguards

The applicant proposes an onsite Sewage Treatment Plant (STP) with a capacity of 100 KLD using electrolysis technology to treat an estimated 79 KLD of wastewater. For solid waste, an Organic Waste Convertor (OWC) with a capacity of 200 kg per day will process biodegradable waste into manure. Non-biodegradable waste will be collected in separate bins and sold to authorized recyclers.

A greenbelt area of 953 square metres (15% of the plot) is planned, featuring 160 trees of local species such as Neem, Ashoka, and Jamun. For rainwater management, two percolation wells are proposed to recharge groundwater. Dust mitigation during construction will include 5-metre tall peripheral barriers and regular water sprinkling.

Timeline

The applicant submitted a notarized undertaking in July 2023 stating that no construction activity had started at the site. Environmental approval for the project was granted on 16 December 2024.

Royal Arcade site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Royal Arcade: Site layout: building blocks, internal roads, and parking areas (preview)🔒 Sign in free to see it
Site layout: building blocks, internal roads, and parking areas
Royal Arcade: Project requirements: built-up area, height, and unit counts (preview)🔒 Sign in free to see it
Project requirements: built-up area, height, and unit counts
Royal Arcade: Site coordinates and polygon map data (preview)🔒 Sign in free to see it
Site coordinates and polygon map data
Royal Arcade: Water balance diagram for operational phase (preview)🔒 Sign in free to see it
Water balance diagram for operational phase

In context

179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.6 acres, this one is smaller than 65% of them.

94 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tandalja, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.