Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Mar 2025 |
| Application filed | 6 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Paramar Mahavirsinh Lakhubhai |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Baravad |
| Taluk / tehsil | Jetpur Pavi |
| District | Chota Udaipur |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05531 |
In context
558 applications in Chota Udaipur since January 2022 are in the same category (Mining): 373 approved, 87 filed or under review, and 98 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 93% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 5.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 32 mining leases have applied within 5 km.
Where it is
Baravad, Jetpur Pavi, Chota Udaipur, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Sankarbhai Chunabhai Kodi Re-appraisal Area-1.05.21 Survey no.- 331 Paiki… — environmental approval granted, 450 m away
- Tulsikumar V. Baria (Barawad Ordinary Sand Block - B3, Area - 3.00 Ha) — environmental approval granted, 550 m away
- Mining project by M/S Shyam Shivam Enterprise Reapprasial Area-01.01.17 Survey… — returned to applicant, 700 m away
- Shri Vasava Mukesh Bijalbhai, Barawad Ordinary Sand Block – B4 Mining Project — environmental approval granted, 700 m away
- Shri Vasava Mukesh Bijalbhai, Barawad Ordinary Sand Block – B4 Mining Project — cleared for impact study, 700 m away
- Mr. Vishvamitra and Co. Re-appraisal Area- 1.06.23, Survey no.- 290, 295… — environmental approval granted, 800 m away
- Shri Rambahadur Yadav. — environmental approval granted, 850 m away
- Shri Rambahadur Yadav. — cleared for impact study, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.