Project details
| Official title | Establishment of Proposed Synthetic Organic Chemicals and Inorganic Chemicals Plant in the Existing Paint (Inorganic) Manufacturing Plant of M/S. Apple Coat LLP |
|---|---|
| Status | Environmental approval granted |
| Status since | 17 Mar 2025 |
| Application filed | 5 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Apple Coat LLP |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹6 crore |
| Village / locality | Vanthvali |
| Taluk / tehsil | Mehmedabad |
| District | Kheda |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05541 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Dec 2024 (this page) | Environmental approval granted | 2.2 acres | ₹6 crore |
| Early planning filed 9 Mar 2024 | Cleared for impact study | 2.2 acres | ₹6 crore |
In context
36 applications in Kheda since January 2022 are in the same category (Industry): 26 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.2 acres, this one is smaller than 58% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vanthvali, Mehmedabad, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Organic Chemicals and Inorganic Chemicals Plant in the… — cleared for impact study, 0 m away
- Industrial project by M/s. ESTO SPECIALITY LLP — cleared for impact study, 1.8 km away
- Industrial project by M/s. ESTO SPECIALITY LLP — more information requested, 1.8 km away
- Expansion in the Existing Chemical Manufacturing Facility located at Plot No… — environmental approval granted, 1.8 km away
- Expansion in the Existing Chemical Manufacturing Facility located at Plot No… — returned to applicant, 1.8 km away
- Expansion in the Existing Chemical Manufacturing Facility located at Plot No… — cleared for impact study, 1.8 km away
- Industrial project by M/s. Maheshvar Ispat Private Limited — environmental approval granted, 1.9 km away
- Diversion of 0.2063 Ha. of Protected Forest Land I.E. Road Side Strip… — lapsed, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.