Kalptaru

Kalptaru is an approved residential project in Ranip, Sabarmati, Ahmadabad, Gujarat. It plans 214 units in 5 towers of up to 9 floors on 1.4 acres. Its stated project cost is ₹40 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 22 Dec 2024).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since22 Dec 2024
Application filed1 Jul 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRanip Kalptaru Cooperative Housing Society Limited
UseResidential
Units214
Towers5
Floors (tallest)9
Basements2
Height30 m
Parking spaces324
Land area1.4 acres (0.6 ha)
Built-up area29,287 m² (3,15,242 sq ft)
Plot area5,687 m² (61,214 sq ft)
Project cost₹40 crore
Village / localityRanip
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-05571

What the filings say

What is planned

Ranip Kalptaru Cooperative Housing Society Limited proposes to develop a residential and commercial building complex in Ranip, Ahmedabad. According to the applicant's project report, the development will consist of multiple blocks with a maximum height of 30.0 metres from ground level.

The project components include:

The building configuration is designed as two basements plus a ground floor and nine upper floors (2B+G+9). The total built-up area is planned at 29,087.37 square metres.

Layout and design

The project is divided into several blocks, identified as Block A+B, Block C, and Block D+E. The ground floor is designed to accommodate 27 shops and parking areas. The first floor will feature a mix of 13 shops and 14 residential units. From the second to the eighth floor, each level will contain 20 residential units. The ninth floor is planned with 19 residential units.

The layout includes a society common amenity area of 53.75 square metres on the ground floor. Internal access is provided through pathways ranging from 1.62 metres to 3.03 metres in width, and ramps with a 1:7 slope for basement access.

Land and surroundings

The project site is located at Final Plot No. 9, Town Planning Scheme No. 02 in Ranip. The total plot area is 0.57 hectares (1.41 acres), with a net plot area of 5,687 square metres after accounting for land not in possession. The site is surrounded by established residential societies such as Viswa Shantiniketan Society, Balolanagar Society, and Umiyanagar Society. Geotechnical investigations conducted in December 2023 found the soil to consist of fine sandy, silty, and clayey layers up to a depth of 20.0 metres.

Water, power and access

During the operation phase, the total water requirement is estimated at 166.47 kilolitres per day (KLD). This includes 156.60 KLD for residential use, 3.6 KLD for shops, 3.0 KLD for visitors, and 3.27 KLD for horticulture. Fresh water demand is expected to be 112.22 KLD.

Waste water generation is projected at 130.56 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 150 KLD. Treated water (54.25 KLD) will be reused for flushing and gardening, while the remaining treated effluent will be discharged into the municipal sewer line. Access to the site is provided by 12.15-metre and 9.14-metre wide Town Planning Scheme roads.

Environmental safeguards

The applicant has allocated a capital budget of ₹99.5 lakh for environmental management, with an annual recurring cost of ₹13.5 lakh. Key measures include:

ItemDetail
Total Built-up Area29,087.37 sq. m.
Residential Units174
Commercial Units40 shops
STP Capacity150 KLD
Greenbelt Area727.94 sq. m.
Estimated Occupancy1,044 residents
Fire Tank Capacity3,00,000 litres (Underground)

Kalptaru site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Kalptaru: Site layout plan: building blocks, internal roads, and common plots (preview)🔒 Sign in free to see it
Site layout plan: building blocks, internal roads, and common plots
Kalptaru: Location map: project site and surrounding residential societies (preview)🔒 Sign in free to see it
Location map: project site and surrounding residential societies
Kalptaru: Aerial view of the site with boundary coordinates (preview)🔒 Sign in free to see it
Aerial view of the site with boundary coordinates
Kalptaru: Rainwater harvesting scheme and recharge well design (preview)🔒 Sign in free to see it
Rainwater harvesting scheme and recharge well design

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 59% of them.

200 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ranip, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.