Quick answers
What is this project?
Smt. Aamriben Nagabhai Vanda , Building Lime Stone , Survey No-191/1 P 51 is a lapsed mining project in Mangrol (M), Mangrol, Junagadh, Gujarat. The site covers 1 acre.
Who is building it?
The applicant is Vanda Amariben.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Mangrol (M), Mangrol, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹40 lakh and a site of 1 acre.
When was it filed?
The application was filed on 27 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Smt. Aamriben Nagabhai Vanda , Building Lime Stone , Survey No-191/1 P 51
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 27 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vanda Amariben |
| Land area | 4,000 m² |
| Project cost | ₹40 lakh |
| Village / locality | Mangrol (M) |
| Taluk / tehsil | Mangrol |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05628 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Jul 2024 | Environmental approval granted | 1 acre | ₹30 lakh |
| New project filed 27 Jun 2024 (this page) | Lapsed | 1 acre | ₹40 lakh |
In context
255 applications in Junagadh since January 2022 are in the same category (Mining): 145 approved, 43 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1 acre, this one is smaller than 99% of them.
No other mining lease on record is within 500 m of this site; 12 have applied within 5 km.
Where it is
Mangrol (M), Mangrol, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Smt. Aamriben Nagabhai Vanda , Building Lime Stone , Survey No-191/1 P 51 — environmental approval granted, 0 m away
- Odedra Yuvraj Nagabhai — cleared for impact study, 2.4 km away
- Jiva Naga Parmar — environmental approval granted, 2.5 km away
- Shri Damjibhai Bhanabhai Vaghela. — initial checks, 2.8 km away
- Shri Damjibhai Bhanabhai Vaghela. — under environmental review, 2.8 km away
- Chanchadiya Vipulbhai Ishwarbhai — environmental approval granted, 2.8 km away
- Vipulbhai Jiladiya. — environmental approval granted, 2.9 km away
- Ukarda Yakub Hajibhai (Block -B) — environmental approval granted, 3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.