What is Developing? Open the mapMap

Cleared for impact studyIndustry · Bharuch, Gujarat

The proposed expansion project of Bulk Drug & Bulk Drug Intermediates Manufacturing Unit at Plot No.C1/7103, GIDC Estate, Ankleshwar Tal: Ankleshwar, Dist: Bharuch, Gujarat -393002 by M/S. Preeten Healthcare Pvt. Ltd.

The proposed expansion project of Bulk Drug & Bulk Drug Intermediates Manufacturing Unit at Plot No.C1/7103, GIDC Estate, Ankleshwar Tal: Ankleshwar, Dist: Bharuch, Gujarat -393002 by M/S. Preeten Healthcare Pvt. Ltd is a proposed industrial project in Jitali, Anklesvar, Bharuch, Gujarat. The site covers 0.2 acres. Its stated project cost is ₹8.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 23 Sept 2024).

See it on the live map All projects in Bharuch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: The proposed expansion project of Bulk Drug & Bulk Drug Intermediates Manufacturing Unit…

Project details

StatusCleared for impact study
Status since23 Sept 2024
Application filed3 Sept 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantPreeten Healthcare PVT LTD
Land area700 m²
Project cost₹8.7 crore
Village / localityJitali
Taluk / tehsilAnklesvar
DistrictBharuch
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-05753

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 5 May 2026Environmental approval granted0.2 acres₹8.7 crore
Expansion filed 12 Feb 2026Returned to applicant0.2 acres₹8.7 crore
Early planning filed 3 Sept 2024 (this page)Cleared for impact study0.2 acres₹8.7 crore

In context

1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 100% of them.

290 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jitali, Anklesvar, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Preeten Healthcare projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.