Proposed Residential Cum Commercial Project Vista Landmark by SMF Enterprises is an approved mixed-use project in Dungra, Vapi, Valsad, Gujarat. It plans 424 units in 7 towers of up to 13 floors on 3.5 acres. Its stated project cost is ₹50 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Jul 2024).

See it on the live map All projects in Valsad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Residential Cum Commercial Project Vista Landmark by SMF Enterprises is an approved mixed-use project in Dungra, Vapi, Valsad, Gujarat. It plans 424 units in 7 towers of up to 13 floors on 3.5 acres.

Who is building it?

The applicant is Smf Enterprises.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 Jul 2024), as of 27 Nov 2026.

Where is it?

In Dungra, Vapi, Valsad, Gujarat.

How big is it?

It has a stated cost of ₹50 crore and a site of 3.5 acres.

When was it filed?

The application was filed on 1 Apr 2024.

Project details

StatusEnvironmental approval granted
Status since9 Jul 2024
Application filed1 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSmf Enterprises
UseMixed use
Units424
Towers7
Floors (tallest)13
Basements1
Parking spaces523
Land area3.5 acres (1.4 ha)
Built-up area232 m² (2,497 sq ft)
Plot area14,062 m² (1,51,362 sq ft)
Project cost₹50 crore
Village / localityDungra
Taluk / tehsilVapi
DistrictValsad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-05793

What the filings say

What is planned

SMF Enterprises proposes to develop Vista Landmark, a residential and commercial project in Dungra village, Vapi. The project is planned on a plot area of 1.41 hectares (3.48 acres). The development includes several distinct building components with varying heights and floor counts:

Layout and design

The site layout incorporates a 24-metre wide Town Planning (TP) main road for primary access. Internal circulation is managed through a network of 6.10-metre wide internal roads and crossover roads ranging from 9 to 12 metres in width. The applicant has designated a specific area for road widening, to be surrendered free of cost.

The project includes a dedicated green area of 1,410 square metres, representing approximately 10% of the net plot area. Open spaces are distributed around the building margins, with front and rear margins typically set at 6 metres.

Water, power and access

Water management plans focus on conservation and reuse. The applicant proposes to install a sewage treatment plant to treat wastewater, which will then be reused for landscaping, flushing, and cooling for Diesel Generator (DG) sets.

Rainwater harvesting is a central feature of the water strategy. The layout plan indicates the installation of multiple rainwater harvesting (RWH) units, including eight units with a capacity of 50,000 litres each and a larger rainwater storage tank (RWST) of 1,50,000 litres. Stormwater management will include silt traps and oil-grease separators in parking areas to prevent contamination before recharging groundwater.

Power backup will be provided by DG sets. These will be housed in acoustic enclosures to limit noise levels to 75 dB(A) at a distance of one metre. Stack heights will be maintained according to regulations to ensure proper dispersion of emissions.

Environmental safeguards

The Environment Management Plan (EMP) outlines several mitigation strategies for the construction and operation phases:

Environmental Monitoring

An Environmental Management Cell will be established to oversee the implementation of the EMP. The monitoring schedule includes testing ambient air quality, water quality, and noise levels every six months during both the construction and operational phases. During operations, stack emissions from DG sets and treated effluent from the sewage treatment plant will also be monitored twice a year.

SMF Enterprises Residential Cum Commercial Project Vista Landmark site plan and layout

2 drawings from the project's filings. Sign in free to see them.

SMF Enterprises Residential Cum Commercial Project Vista Landmark: Site layout plan: building blocks, internal roads, and rainwater harvesting locations (preview)🔒 Sign in free to see it
Site layout plan: building blocks, internal roads, and rainwater harvesting locations
SMF Enterprises Residential Cum Commercial Project Vista Landmark: Detailed plot layout showing building heights, floor counts and road widening area (preview)🔒 Sign in free to see it
Detailed plot layout showing building heights, floor counts and road widening area

In context

64 applications in Valsad since January 2022 are in the same category (Buildings & townships): 46 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.5 acres, this one is smaller than 53% of them.

199 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dungra, Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.