Quick answers
What is this project?
Proposed Expansion of Synthetic Organic Chemicals Manufacturing Unit by M/s Green Sea Industries Pvt. Ltd.; at Survey No. Survey No. 7/12, Village: Shikarpur, Tal - Bhachau, Dist - Kutch, Gujarat is an approved industrial project in Shikharpur, Bhachau, Kachchh, Gujarat. The site covers 4.4 acres.
Who is building it?
The applicant is Green Sea Industries Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Jul 2025), as of 27 Nov 2026.
Where is it?
In Shikharpur, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹14.3 crore and a site of 4.4 acres.
When was it filed?
The application was filed on 5 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Jul 2025 |
| Application filed | 5 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Green Sea Industries Private Limited |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹14.3 crore |
| Village / locality | Shikharpur |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05962 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.4 acres, this one is smaller than 87% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shikharpur, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Veer Chemical — lapsed, 1.1 km away
- Diversion of Forest Land of Shikarpur Village for Laying of Underground Water… — more information requested, 1.3 km away
- Diversion of Forest Land of Shikarpur Village for Laying of Underground Water… — lapsed, 1.3 km away
- Approach Road for the Approach Access for Our Proposed Fuel Station — forest land use approved, 2.4 km away
- Shri Koli Shamji (Naransari Ordinary Sand Block –1) — environmental approval granted, 4 km away
- Shri Kachchhi Hirenkumar Mahendrabhai — environmental approval granted, 4.8 km away
- Development of Bridge at Village: Haripar, Near Unsurveyed Land Taluka: Maliya… — lapsed, 8.4 km away
- Waste management project by Detox India PVT. LTD. — environmental approval granted, 11.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.