Quick answers
What is Nilkanth Heaven?
Nilkanth Heaven is an approved mixed-use project in Simada, Majura, Surat, Gujarat. It plans 313 units in 5 towers of up to 14 floors on 1.2 acres.
Who is building it?
The applicant is Bhagubhai M Patel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Apr 2025), as of 27 Nov 2026.
Where is it?
In Simada, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹36.1 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 25 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Apr 2025 |
| Application filed | 25 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Bhagubhai M Patel |
| Use | Mixed use |
| Units | 313 |
| Towers | 5 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 341 |
| Land area | 1.2 acres (0.5 ha) |
| Built-up area | 33,941 m² (3,65,338 sq ft) |
| Plot area | 4,856 m² (52,269 sq ft) |
| Project cost | ₹36.1 crore |
| Village / locality | Simada |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06071 |
What the filings say
What is planned
Nilkanth Heaven is a residential and commercial development proposed on a plot of 0.49 hectares (1.21 acres) in Simada, Surat. The applicant's project report describes a complex consisting of five buildings, designated as Blocks A through E, all rising to a height of 44.81 metres with a ground floor and 14 upper storeys. The project also includes two levels of basement parking.
According to the building plans, the development will provide a total of 280 residential units and 33 commercial shops. The commercial component is located on the ground floor, while the upper floors are dedicated to residential use.
| Item | Detail |
|---|---|
| Total Built-up Area | 33,941.41 square metres |
| F.S.I. Area | 19,106.30 square metres |
| Tallest Building Height | 44.81 metres |
| Total Floors | Ground + 14 Floors |
| Residential Units | 280 |
| Commercial Shops | 33 |
| Basement Levels | 2 |
Layout and design
The project is divided into distinct blocks. Blocks A and B are integrated into a single structure, while Blocks C, D, and E are separate wings. The ground floor layout features 20 shops in the A/B/C section and 13 shops in the D/E section. Residential units are distributed across the 1st to 14th floors.
The design incorporates two basement levels for parking, with the first basement covering 4,057.77 square metres and the second basement also covering 4,057.77 square metres. The ground floor includes a foyer for each block and internal road access. The terrace level of each building will house stair cabins, lift machine rooms, and overhead water tanks.
Land and surroundings
The project site is located at Final Plot No. 105 and 106 in Simada, Surat. The net plot area is 4,856 square metres. The site is bounded by an 18-metre wide Town Planning (T.P.) road. The applicant has allocated 514.81 square metres for a common plot, representing approximately 10.6% of the land area. A green belt development plan is included, covering 868.42 square metres (17.88% of the plot), which will feature 125 trees including species such as Asopalav, Gulmohar, Palm, Badam, and Neem.
Water, power and access
Water requirements will be met through the local municipal supply. For wastewater management, the applicant proposes a Sewage Treatment Plant (STP) with a capacity of 200 kilolitres per day (KLD) using Membrane Bio-Reactor (MBR) technology. Treated sewage will be discharged into the Surat Municipal Corporation (SMC) drainage system.
Rainwater harvesting is planned through a collection system and two percolating recharge wells. For power, the project includes a rooftop solar installation of 80 KW capacity, requiring 480 square metres of terrace space. Diesel Generator (DG) sets will be installed in the basement with acoustic enclosures for emergency backup.
Environmental safeguards
The Environmental Management Plan (EMP) outlines measures for dust mitigation during construction and noise control during operation. Solid waste management will involve an automatic Organic Waste Converter (OWC) with a capacity of 500 kg per day. The applicant has budgeted ₹2.35 crore for capital expenditure on environmental and safety infrastructure, including fire-fighting systems as per municipal norms.
Timeline
The applicant's project report states that the entire project is expected to be completed within approximately four years from the start of work. Installation of environmental management units will proceed parallel to the building construction.
Nilkanth Heaven site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 72% of them.
165 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Simada, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amideep Valley — environmental approval granted, 50 m away
- Millennium Business Hub – 3 — environmental approval granted, 550 m away
- Commercial Building Project by Parbatbhai Kachhadiya — environmental approval granted, 550 m away
- The Abalone — environmental approval granted, 550 m away
- Vastu Elevate — initial checks, 550 m away
- Navkar Green City — initial checks, 900 m away
- Royal Greens — environmental approval granted, 1 km away
- Eartham Heights — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.