What is Samved Opera?
Samved Opera is an approved residential project in Sargasan, Gandhinagar, Gujarat. It plans 638 units in 6 towers of up to 13 floors on 3.5 acres.
Who is building it?
The applicant is Madhav Buildcon.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Jun 2024), as of 27 Nov 2026.
Where is it?
In Sargasan, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹202.4 crore and a site of 3.5 acres.
When was it filed?
The application was filed on 31 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Jun 2024 |
| Application filed | 31 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Madhav Buildcon |
| Use | Residential |
| Units | 638 |
| Towers | 6 |
| Floors (tallest) | 13 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 836 |
| Land area | 3.5 acres (1.4 ha) |
| Built-up area | 1,01,020 m² (10,87,369 sq ft) |
| Plot area | 14,071 m² (1,51,459 sq ft) |
| Project cost | ₹202.4 crore |
| Village / locality | Sargasan |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06086 |
What the filings say
What is planned
Madhav Buildcon's project report for Samved Opera describes a new residential and commercial development in Sargasan, Gandhinagar. The project is planned on a plot area of 1.41 hectares (3.48 acres) and consists of 13 blocks (labeled A to M) with two levels of basement parking.
The development includes residential units and commercial shops. According to the unit area tables, the project features:
- Residential Blocks: Blocks A through M are primarily residential towers. Most blocks rise to 13 floors above a hollow plinth or ground floor level.
- Commercial Component: Shops are located on the ground and first floors of specific blocks. The layout plan shows 41 shops on the ground floor and additional units on the first floor.
- Amenities: The plan includes two society amenities areas, a clubhouse, and a gym.
Layout and design
The project is designed around a central open space with internal roads ranging from 6.0 metres to 7.5 metres in width. The site is bordered by an 18.0-metre wide Town Planning (TP) road.
Each residential block is equipped with multiple lifts, including designated fire lifts. The typical floor plans for blocks such as L and M show 3-BHK (bedroom, hall, kitchen) configurations with attached balconies, wash areas, and stores. The building height for the residential blocks reaches approximately 45 metres above ground level.
Parking is distributed across two basement levels and ground-level open spaces. The basement plans include dedicated areas for four-wheeler and two-wheeler parking, including specific spots for persons with disabilities.
Water, power and access
The applicant has planned for significant water storage infrastructure. The domestic water tank capacity is split into two phases, with Phase 1 holding 1,80,000 litres and Phase 2 holding 1,90,000 litres. A separate fire water tank has a capacity of 1,21,000 litres, and a commercial water tank holds 17,000 litres.
Power requirements will be supported by on-site electrical infrastructure, including multiple 1,000 KVA Compact Substations (CSS). For emergency backup, the plans specify a 500 KVA Diesel Generator (DG) set and a smaller 30 KVA DG set.
Environmental safeguards
A Sewage Treatment Plant (STP) with a capacity of 385 kilolitres per day (KLD) is planned for the second basement level. The project also incorporates a grey water recycling system and dual plumbing.
For rainwater management, the applicant proposes a rainwater harvesting system and percolating wells as per National Building Code (NBC) 1983 standards. The layout includes significant tree plantation along the periphery and within common plots. Solar-assisted water heating systems and rooftop solar energy installations are also specified in the project notes.
Fire safety and security
The buildings will be equipped with a comprehensive fire hydrant system, including a main fire pump at the underground tank capable of discharging 900 litres per minute. Fire safety features include:
- Automatic sprinkler systems for basements exceeding 200 square metres.
- Fire alarm call points and sounders on each floor.
- Fire extinguishers (CO2 and Dry Chemical Powder) on every floor.
- Pressurized staircases and lift wells to prevent smoke logging.
- Photo-luminescent (auto-glow) signage for exit routes.
Samved Opera site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.5 acres, this one is larger than 92% of them.
181 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sargasan, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Palasa Residency — environmental approval granted, 300 m away
- Park Paradise — environmental approval granted, 300 m away
- Embrace The Wind — environmental approval granted, 350 m away
- Embrace The Wind — environmental approval granted, 350 m away
- Swagat Glassglow — environmental approval granted, 500 m away
- Shreeya Amazia — environmental approval granted, 750 m away
- The Imperial Heights — environmental approval granted, 750 m away
- 624 EWS-ii Residential Flats Including Infrastructure Development Under PMAY — environmental approval granted, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.