Quick answers
What is this project?
This proposed mining project by M/s. Bapa Sitaram Enterprise Prop- Shri Ajitsinh Jatubha Jadeja 1.21.41 Hect. is in Punadi, Mandvi, Kachchh, Gujarat. The site covers 3 acres.
Who is building it?
The applicant is Ajitsinh Jadeja.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 Dec 2024), as of 27 Nov 2026.
Where is it?
In Punadi, Mandvi, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹3.9 crore and a site of 3 acres.
When was it filed?
The application was filed on 23 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s. Bapa Sitaram Enterprise Prop- Shri Ajitsinh Jatubha Jadeja…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Dec 2024 |
| Application filed | 23 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ajitsinh Jadeja |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹3.9 crore |
| Village / locality | Punadi |
| Taluk / tehsil | Mandvi |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06094 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Apr 2025 | Environmental approval granted | 3 acres | ₹3.9 crore |
| Early planning filed 23 Mar 2024 (this page) | Cleared for impact study | 3 acres | ₹3.9 crore |
In context
1,132 applications in Kachchh since January 2022 are in the same category (Mining): 683 approved, 276 filed or under review, and 173 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3 acres, this one is smaller than 88% of them.
9 other mining leases have applied within 500 m of this site; together with this one they cover 63 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 48 mining leases have applied within 5 km.
Where it is
Punadi, Mandvi, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Bapa Sitaram Enterprise Prop- Shri Ajitsinh Jatubha… — environmental approval granted, 0 m away
- Mining project by M/s. Bapa Sitaram Enterprise Prop- Shri Ajitsinh Jatubha… — environmental approval granted, 200 m away
- Mining project by M/s. Bapa Sitaram Enterprise Prop- Shri Ajitsinh Jatubha… — cleared for impact study, 200 m away
- Shri Vinod Harjibhai Jodhani (Punadi) — lapsed, 200 m away
- Ramji Mamu Sanghar — lapsed, 200 m away
- Ramji Mamu Sanghar — cleared for impact study, 200 m away
- Shri Vinod Harjibhai Jodhani (Punadi) — cleared for impact study, 200 m away
- Gusai Mahendra Chanchalgar. — under environmental review, 250 m away
More from Ajitsinh Jadeja in Kachchh
- Mining project by M/s. Bapa Sitaram Enterprise Prop- Shri Ajitsinh Jatubha… — environmental approval granted
- Mining project by M/s. Bapa Sitaram Enterprise Prop- Shri Ajitsinh Jatubha… — cleared for impact study
- Shri Khengarji Malubha Jadeja — under environmental review
- Shri Ajitsinh Malubha Jadeja — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.