Quick answers
What is this project?
Punat Blacktrap Mining Project, Survey No. 66/2 Paiki 5, Proposed by Smt. Hemaben Nileshbhai Patel is an approved mining project in Punat, Umbergaon, Valsad, Gujarat. The site covers 2.7 acres.
Who is building it?
The applicant is Hemaben Nileshbhai Patel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Feb 2025), as of 27 Nov 2026.
Where is it?
In Punat, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹2 crore and a site of 2.7 acres.
When was it filed?
The application was filed on 28 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Feb 2025 |
| Application filed | 28 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Hemaben Nileshbhai Patel |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹2 crore |
| Village / locality | Punat |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06154 |
In context
92 applications in Valsad since January 2022 are in the same category (Mining): 24 approved, 10 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.7 acres, this one is larger than 50% of them.
No other mining lease on record is within 500 m of this site; 15 have applied within 5 km.
Where it is
Punat, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sarigam Blacktrap Mining Project [68/2 Paiki - 4/ Paiki-1, 69/1 Paiki-5] — not approved, 650 m away
- Sarigam Blacktrap Mining Project [Survey No. 68/2 Paiki /4]] — not approved, 750 m away
- Sarigam Blacktrap Mining Project, Survey No. 69/1 Paiki 4, Proposed by M/s… — not approved, 950 m away
- Mining project by M/S Shree RAmeshwar Stone Supplier — not approved, 1 km away
- Mining project by M/S Shree Rameshwar Stone Supplier — not approved, 1.1 km away
- Amendment in Existing Environment Clearance for Expansion of Pesticide… — environmental approval granted, 1.1 km away
- Industrial project by M/s. Cytech Coating Pvt. Ltd. (Unit – III) — environmental approval granted, 1.1 km away
- Industrial project by M/s. Cytech Coating Pvt. Ltd. (Unit – III) — cleared for impact study, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.