Quick answers
What is this project?
Balej Building Limestone Block B6 mining Project, Survey No. 52/4/1P & New Survey No. 3363, Proposed by Shri Hirabhai Jethabhai Makvana is a lapsed mining project in Balej, Porbandar, Gujarat. The site covers 2.5 acres.
Who is building it?
The applicant is Hira Jetha Makvana.
Has it been approved?
No. The application was lapsed on 17 Oct 2025, so it is no longer under consideration.
Where is it?
In Balej, Porbandar, Gujarat.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 8 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Oct 2025 |
| Application filed | 8 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Hira Jetha Makvana |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Balej |
| Taluk / tehsil | Porbandar |
| District | Porbandar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06310 |
In context
144 applications in Porbandar since January 2022 are in the same category (Mining): 53 approved, 21 filed or under review, and 70 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 72% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 31 mining leases have applied within 5 km.
Where it is
Balej, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Balej Building Limestone Block B5 Mining Project, Survey No. 52/4/1 P & New… — lapsed, 300 m away
- Nathabhai Dudabhai Rabari — environmental approval granted, 550 m away
- Mulubhai Karashanbhai Timba — environmental approval granted, 650 m away
- Dhanabhai Karmanbhai Kodiyatar — lapsed, 1.3 km away
- Shaileshbhai Karshanbhai Baleja — lapsed, 1.4 km away
- Shaileshbhai Karshanbhai Baleja — cleared for impact study, 1.4 km away
- Mulubhai Galabhai Ulva — cleared for impact study, 1.4 km away
- Devabhai Arjanbhai Parmar — cleared for impact study, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.