What is Developing? Open the mapMap

Cleared for impact studyMining · Banas Kantha, Gujarat

Shri Prakasha Dhanaji Vanazara . Govt. Land&Survey No.-Banas River Paiki, Banas River Bed (Sanath Ordinary Sand Block No. –23)

Shri Prakasha Dhanaji Vanazara . Govt. Land&Survey No.-Banas River Paiki, Banas River Bed (Sanath Ordinary Sand Block No. –23) is a proposed mining project in Sanath, Deesa, Banas Kantha, Gujarat. The site covers 4.9 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 27 May 2025).

See it on the live map All projects in Banas Kantha

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Shri Prakasha Dhanaji Vanazara . Govt. Land&Survey No.-Banas River Paiki, Banas River Bed (Sanath Ordinary Sand Block No. –23) is a proposed mining project in Sanath, Deesa, Banas Kantha, Gujarat. The site covers 4.9 acres.

Who is building it?

The applicant is Vanzara Prakash Dhanjibhai.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 27 May 2025), as of 27 Nov 2026.

Where is it?

In Sanath, Deesa, Banas Kantha, Gujarat.

How big is it?

It has a stated cost of ₹2 crore and a site of 4.9 acres.

When was it filed?

The application was filed on 28 Oct 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Shri Prakasha Dhanaji Vanazara . Govt. Land&Survey No.-Banas River Paiki, Banas River…

Project details

StatusCleared for impact study
Status since27 May 2025
Application filed28 Oct 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantVanzara Prakash Dhanjibhai
Land area4.9 acres (2 ha)
Project cost₹2 crore
Village / localitySanath
Taluk / tehsilDeesa
DistrictBanas Kantha
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-06348

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Sept 2025Environmental approval granted4.9 acres₹2 crore
Early planning filed 28 Oct 2024 (this page)Cleared for impact study4.9 acres₹2 crore

In context

380 applications in Banas Kantha since January 2022 are in the same category (Mining): 234 approved, 68 filed or under review, and 78 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 76% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 24.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 50 mining leases have applied within 5 km.

Where it is

Sanath, Deesa, Banas Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vanzara Prakash Dhanjibhai in Banas Kantha

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.