Quick answers
What is this project?
Alipore Blacktrap Mining Project, Survey No. 1789 Paiky, Proposed by M/s Salimbhai Ahmedbhai Ranguni is an approved mining project in Alipor, Chikhli, Navsari, Gujarat. The site covers 2.5 acres.
Who is building it?
The applicant is Salim Ahmad Ranguni.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Jan 2025), as of 27 Nov 2026.
Where is it?
In Alipor, Chikhli, Navsari, Gujarat.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 26 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Jan 2025 |
| Application filed | 26 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Salim Ahmad Ranguni |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Alipor |
| Taluk / tehsil | Chikhli |
| District | Navsari |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06566 |
In context
150 applications in Navsari since January 2022 are in the same category (Mining): 57 approved, 22 filed or under review, and 71 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 61% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 24 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 77 mining leases have applied within 5 km.
Where it is
Alipor, Chikhli, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ambika Stone Quarry C/o. Narendrakumar M Parmar (Alipore Blacktrap Mine) — not approved, 150 m away
- Mukeshbhai Jamnadas Faldu (Alipore Blacktrap Mine) — under environmental review, 200 m away
- Sagar Veneer Industries — lapsed, 300 m away
- Sh. Usmanbhai Gulabbhai Vijapura( Alipor Blacktrap Quarry Area ) — not approved, 300 m away
- Alipore Blacktrap Mining Project, Survey No. 1832 Paiki, Proposed by Shri… — environmental approval granted, 300 m away
- Khundh Blacktrap Mining Project [Survey No. 415 P - 1 Paiki] — environmental approval granted, 850 m away
- Alipore Blacktrap Mining Project, Survey No. 2014 Paiki 1, Proposed by Shri… — environmental approval granted, 950 m away
- Raj quarry works 1.00 Ha — not approved, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.