Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Palm Jumeirah

Palm Jumeirah is an approved mixed-use project in Makarba, Sabarmati, Ahmadabad, Gujarat. It plans 293 units in 2 towers of up to 14 floors on 2.2 acres. Its stated project cost is ₹85.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Jul 2024).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since9 Jul 2024
Application filed2 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantVenus Projects LLP
UseMixed use
Units293
Towers2
Floors (tallest)14
Basements2
Parking spaces499
Land area2.2 acres (0.9 ha)
Built-up area58,534 m² (6,30,054 sq ft)
Plot area8,863 m² (95,400 sq ft)
Project cost₹85.5 crore
Village / localityMakarba
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-06754

What the filings say

What is planned

Venus Projects LLP proposes a mixed-use development consisting of residential and commercial spaces. The project involves the construction of six blocks, identified as Blocks A to F, on an amalgamated plot. According to the applicant's project report, the residential component includes 286 units, while the commercial section will feature 7 shops. The buildings are designed with a maximum height of 14 floors above ground level, supported by two basement levels for parking.

Layout and design

The project is planned with a total built-up area of 33,754.93 sq. m. and a total Floor Space Index (FSI) area of 31,884.62 sq. m. The site includes a hollow plinth for parking and two basement levels, each covering 6,404.47 sq. m. Open spaces are provided through two common plots totaling 1,113.42 sq. m. The layout includes a 5.18m wide pathway and a 6.0m wide approach road.

ItemDetail
Residential units286
Commercial shops7
Tallest building14 floors
Total water requirement270.54 KLD
STP capacity250 KLD
Greenbelt area1,113.42 sq. m.
Tree plantation222 trees
Environmental budget₹97.5 lakh

Land and surroundings

The site is located at Final Plot No. 51 and 57 in Makarba, Ahmedabad, opposite the Makarba Police Headquarters. The geotechnical investigation report describes the surface as uneven ground. Subsurface testing revealed layers of firm black clayey silt up to 1.5m, followed by stiff brown clayey silt and medium brown silty sand with kankar. The groundwater table was encountered at a depth of 6.7m, with a design water table suggested at 5m.

Water, power and access

The total water requirement for the operation phase is estimated at 270.54 kilolitres per day (KLD). This includes a fresh water requirement of 182.96 KLD and a recycled water requirement of 87.58 KLD for flushing and gardening. During construction, the water demand is 17.5 KLD. Power will be supplied from a nearby 132 KV electric grid line. The project site is accessible via 18m and 40m wide Town Planning Scheme roads.

Environmental safeguards

The applicant proposes to install a Sewage Treatment Plant (STP) with a capacity of 250 KLD. For storm water management, three percolation wells will be developed to recharge groundwater, with an estimated annual recharge volume of 3,800 cubic metres. The greenbelt plan covers 1,113.42 sq. m. and involves planting 222 trees in two phases. A capital budget of ₹97.5 lakh is allocated for environmental management, including ₹30 lakh for the STP and ₹21 lakh for air pollution control measures.

Safety features

Fire safety installations will include a 2,50,000-litre underground static water storage tank and 20,000-litre terrace tanks for each block. The buildings will be equipped with wet risers, automatic sprinklers in the basement and commercial areas, and manually operated electric fire alarm systems.

Palm Jumeirah site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Palm Jumeirah: Layout plan: blocks A-F, common plots, and internal roads (preview)🔒 Sign in free to see it
Layout plan: blocks A-F, common plots, and internal roads
Palm Jumeirah: Satellite view of the project site and surrounding Makarba area (preview)🔒 Sign in free to see it
Satellite view of the project site and surrounding Makarba area
Palm Jumeirah: Location map: site relative to Sarkhej and Juhapura (preview)🔒 Sign in free to see it
Location map: site relative to Sarkhej and Juhapura
Palm Jumeirah: Rainwater harvesting scheme: desilting chamber and recharge well details (preview)🔒 Sign in free to see it
Rainwater harvesting scheme: desilting chamber and recharge well details

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.2 acres, this one is larger than 70% of them.

163 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Makarba, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.