LapsedMining · Surendranagar, Gujarat

M/S Union Construction Co. C/O K.P.Patel Mining of Black Trap. Mota Madhad Black Trap Quarry lease

M/S Union Construction Co. C/O K.P.Patel Mining of Black Trap. Mota Madhad Black Trap Quarry lease is a lapsed mining project in Madhad (Wadhwan), Wadhwan, Surendranagar, Gujarat. The site covers 7.4 acres. Its stated project cost is ₹1.6 crore. As of 27 Nov 2026, its status is “Lapsed” (since 8 Jun 2025).

See it on the live map All projects in Surendranagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

M/S Union Construction Co. C/O K.P.Patel Mining of Black Trap. Mota Madhad Black Trap Quarry lease is a lapsed mining project in Madhad (Wadhwan), Wadhwan, Surendranagar, Gujarat. The site covers 7.4 acres.

Who is building it?

The applicant is Union Construction Co.

Has it been approved?

No. The application was lapsed on 8 Jun 2025, so it is no longer under consideration.

Where is it?

In Madhad (Wadhwan), Wadhwan, Surendranagar, Gujarat.

How big is it?

It has a stated cost of ₹1.6 crore and a site of 7.4 acres.

When was it filed?

The application was filed on 27 Nov 2024.

Project details

Official titleM/S Union Construction Co. C/O K.P.Patel Mining of Black Trap. Mota Madhad Black Trap Quarry lease situated at Village – Mota Madhad admeasuring 3.00.00 Ha area at Survey number 66 Paiki, near Village: - Mota Madhad Taluka: - Wadhwan, District: - Surendranagar, State: - Gujarat
StatusLapsed
Status since8 Jun 2025
Application filed27 Nov 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantUnion Construction Co
Land area7.4 acres (3 ha)
Project cost₹1.6 crore
Village / localityMadhad (Wadhwan)
Taluk / tehsilWadhwan
DistrictSurendranagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-06787

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 27 Nov 2024 (this page)Lapsed7.4 acres₹1.6 crore
Early planning filed 22 Oct 2024Withdrawn7.4 acres₹1.6 crore

In context

271 applications in Surendranagar since January 2022 are in the same category (Mining): 107 approved, 59 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.4 acres, this one is larger than 72% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 9.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 29 mining leases have applied within 5 km.

Where it is

Madhad (Wadhwan), Wadhwan, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.