Swastik Harmony is an approved mixed-use project in Zundal, Gandhinagar, Gujarat. It plans 175 units in 4 towers of up to 14 floors on 1 acre.
Who is building it?
The applicant is Harmony Developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Dec 2024), as of 27 Nov 2026.
Where is it?
In Zundal, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹60 lakh and a site of 1 acre.
When was it filed?
The application was filed on 16 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Dec 2024 |
| Application filed | 16 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Harmony Developers |
| Use | Mixed use |
| Units | 175 |
| Towers | 4 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Land area | 3,900 m² |
| Built-up area | 27,098 m² (2,91,680 sq ft) |
| Plot area | 3,870 m² (41,656 sq ft) |
| Project cost | ₹60 lakh |
| Village / locality | Zundal |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06917 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 16 Aug 2024 (this page) | Environmental approval granted | 1 acre | ₹60 lakh |
| New project filed 2 Mar 2024 | Environmental approval granted | 1 acre | ₹60 lakh |
What the filings say
What is planned
Harmony Developers is proposing a residential and commercial building project located in Zundal, Gandhinagar. According to the applicant's project report, the development will consist of four blocks (Blocks A, B, C, and D) with two level basements, a ground floor, and 14 upper floors. The project is designed as a Residential Affordable Housing project.
The project includes a total of 175 residential units and 37 commercial units (shops). Block A is planned as a standalone residential block, while Blocks B, C, and D are integrated. The ground floor and first floor are designated for commercial use, with residential units starting from the second floor upwards.
| Item | Detail |
|---|---|
| Total Built-up Area | 27,033.73 sq. mt. |
| FSI Area | 14,752.12 sq. mt. |
| Residential Units | 175 |
| Commercial Units | 37 |
| Max Floors | 14 floors + Ground + 2 Basements |
| Common Plot Area | 387.24 sq. mt. |
| Total Lifts | 8 (6-passenger capacity) |
Layout and design
The layout plan specifies that the project will be built on Final Plot (F.P.) No. 159/2. The design includes two levels of basement parking. The first basement covers 3,332.92 sq. mt., and the second basement also covers 3,332.92 sq. mt. Ground-level parking is provided in hollow plinth areas and open margins.
Access to the site is provided via an 18.00-metre wide Town Planning Scheme (TPS) road. Internal movement is facilitated by 6.00-metre wide approach roads and 6.03-metre wide ramps for basement access. The building foyer areas range from approximately 1.54 sq. mt. to 9.53 sq. mt. depending on the block.
Water and Environmental Safeguards
The applicant proposes several environmental management features:
- Rainwater Harvesting: One percolation well is planned to recharge the underground aquifer. The system includes a catch pit with filtration media (coarse sand, pea gravel, and gravel).
- Waste Management: For residential waste, 22 community bins of 80-litre capacity each are proposed. For commercial waste, 4 containers of 80-litre capacity are planned, totaling 26 bins.
- Greenery: The project report states a requirement for 97 trees to be planted on the site.
- Sanitation: A Sewage Treatment Plant (STP) is indicated in the layout. The commercial section includes 39 individual water closets (W.C.) for shops and common sanitary provisions for males, females, and physically handicapped persons.
- Water Storage: The design includes an underground water tank (U.G.W.T.), a dedicated fire tank, and a storage tank.
Fire Safety
Fire safety provisions are planned in accordance with the Gujarat Comprehensive General Development Control Regulations (CGDCR) 2017 and the Fire Prevention and Life Safety Measures Act. Planned measures include:
- A wet riser/down-comer system with a 100 mm internal diameter.
- An overhead tank of 20,000 litres and an underground tank of 1,00,000 litres for fire fighting.
- Automatic sprinkler systems in the basement areas exceeding 200 sq. mt.
- Fire lifts in each block and fire-resistant doors (F.R.D.) for lift foyers.
- Fire extinguishers (CO2 and DCP types) on every floor.
Swastik Harmony site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 83% of them.
144 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Zundal, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Swastik Harmony — environmental approval granted, 0 m away
- "radiant Rays" — environmental approval granted, 50 m away
- Radiant Rays — withdrawn, 50 m away
- Radiant Rays — returned to applicant, 50 m away
- Radiant Rays — environmental approval granted, 50 m away
- Proposed Residential and Commercial (Essential Shops) Project – 'Om Elegance'… — environmental approval granted, 100 m away
- The Atlantis 2 — environmental approval granted, 300 m away
- Samhita — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.