The Proposed Proposal Is for Expansion in Existing Plant Capacity (Non-Ec Products) With Addition of Synthetic Organic Chemicals Manufacturing Unit Having Total Capacity of 250.0 Mt/Month at Its Existing Location at Plot No.: 1401/5, Phase-Iii, Gidc Vapi, Tal: Pardi, Dist.: Valsad-396195, Gujarat by M/S. Bhavini Products, Unit-Ii is a proposed industrial project in Chhiri, Vapi, Valsad, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Subhash Patel.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Chhiri, Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹9.2 crore and a site of 0.3 acres.
When was it filed?
The application was filed on 27 Jun 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: The Proposed Proposal Is for Expansion in Existing Plant Capacity (Non-Ec Products) With…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 23 Jul 2025 |
| Application filed | 27 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Subhash Patel |
| Land area | 1,400 m² |
| Project cost | ₹9.2 crore |
| Village / locality | Chhiri |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-06997 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 Jun 2025 (this page) | Returned to applicant | 0.3 acres | ₹9.2 crore |
| Early planning filed 7 Feb 2024 | Cleared for impact study | 0.3 acres | ₹9.2 crore |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.3 acres, this one is smaller than 89% of them.
217 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhiri, Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Proposed Proposal Is for Expansion in Existing Plant Capacity (Non-Ec… — cleared for impact study, 0 m away
- Proposed expansion project for the manufacturing of dyes intermediates & API… — environmental approval granted, 50 m away
- Proposed expansion project for the manufacturing of dyes intermediates & API… — cleared for impact study, 50 m away
- EC Amendment for Existing Unit of Organic Pigment Products Manufacturing Unit… — environmental approval granted, 100 m away
- Expansion of Pesticide Technical, Pesticide Intermediates and R & D Products… — environmental approval granted, 150 m away
- Expansion of Pesticide Technical, Pesticide Intermediates and R & D Products… — returned to applicant, 150 m away
- Expansion of Pesticide Technical, Pesticide Intermediates and R & D Products… — lapsed, 150 m away