Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Jul 2025 |
| Application filed | 10 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gopalanand corporation |
| Use | Mixed use |
| Units | 366 |
| Towers | 3 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 409 |
| Land area | 1.6 acres (0.6 ha) |
| Built-up area | 48,918 m² (5,26,548 sq ft) |
| Plot area | 6,279 m² (67,587 sq ft) |
| Project cost | ₹78.3 crore |
| Village / locality | Hanspura |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07030 |
What the filings say
What is planned
Naroda Arise is a proposed mixed-use residential and commercial development by Gopalanand Corporation. The project consists of six blocks (A through F) designed for both Residential Affordable Housing (RAH) and non-RAH use. The applicant's layout plan specifies a total of 366 units, comprising 354 residential dwellings and 12 commercial shops.
The building configuration includes two basement levels for parking, a ground floor for shops and hollow plinth parking, and 14 upper floors. The residential units are categorized by size, with 112 units between 50 and 66 square metres, and 112 units between 66 and 90 square metres. The commercial component is concentrated on the ground floor of Blocks A and B, covering a floor area of 293.23 square metres.
Project Components
| Item | Detail |
|---|---|
| Total Units | 366 (354 Residential, 12 Commercial) |
| Building Blocks | 6 (Blocks A, B, C, D, E, F) |
| Maximum Height | 2 Basements + Ground + 14 Floors |
| Total Built-up Area | 48,918.48 square metres |
| Common Plot Area | 695.79 square metres |
| Tree Plantation | 157 trees |
| Solar Power Capacity | 119.73 KW |
Layout and design
The site is organized with blocks arranged around a central common plot of 695.79 square metres. Blocks A and B are situated at the front of the site, while Blocks C, D, E, and F are positioned towards the rear. A 6.00-metre wide clear margin is maintained around the periphery of the buildings to allow for fire tender movement.
Vertical circulation is provided by two lifts per block, including one designated fire lift. Parking is distributed across two basement levels and the hollow plinth area on the ground floor. The design incorporates a society office of 186.36 square metres for common use by members.
Water, power and access
During the construction phase, water will be sourced from local tanker suppliers. For operations, the Ahmedabad Municipal Corporation (AMC) will provide the water supply. The project includes a sewage treatment plant (STP) with a capacity of 300 kilolitres per day (KLD) using the Activated Sludge Process. Treated water will be reused for gardening and toilet flushing, with any excess discharged into the AMC drainage line.
Power will be sourced from the local grid, supported by a diesel generator (DG) set for emergency backup. Energy conservation measures include the installation of rooftop solar panels covering 919.57 square metres and the use of LED lighting in common areas.
Access to the site is provided via an 18.00-metre wide Town Planning Scheme (TPS) road. The internal layout features 6-metre wide roads and dedicated entry and exit points to regulate traffic flow.
Environmental safeguards
The applicant has proposed an Environmental Management Plan with a capital budget of ₹4.09 crore. Key safeguards include:
- Waste Management: Solid waste will be segregated into dry and wet streams. An organic waste converter with a capacity of 500 kg/day will process wet waste into compost for the greenbelt.
- Rainwater Harvesting: Two percolation wells are planned to recharge the groundwater table.
- Air and Noise: Dust mitigation during construction involves 10-metre high wind-breakers, water sprinkling, and tarpaulin covers for materials. The DG set will be housed in an acoustic enclosure to minimize noise.
- Greenbelt: A total of 157 trees will be planted, alongside lawn area development, to improve local air quality and provide a noise buffer.
- Corporate Environment Responsibility (CER): The applicant proposes to plant trees along the S.P. Ring Road, install solar panels at the Government School in Nana Chiloda and Huka Primary School, and undertake beautification works at Kathwada Lake.
Naroda Arise site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is smaller than 51% of them.
240 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hanspura, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential and Commercial Building Construction Project by Bapashree… — environmental approval granted, 100 m away
- Fortune Empire — environmental approval granted, 250 m away
- Diversion of 0.70 Ha of forest land — more information requested, 350 m away
- Virasat — environmental approval granted, 350 m away
- Virasat — environmental approval granted, 350 m away
- Virasat — environmental approval granted, 350 m away
- Oscar Belmont — initial checks, 350 m away
- Ganesh Glorious — environmental approval granted, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.