Quick answers
What is Industrial project by M/s. Sun Industries?
This approved industrial project by M/s. Sun Industries is in Antaliya, Gandevi, Navsari, Gujarat. The site covers 0.7 acres.
Who is building it?
The applicant is Sun Industries.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Aug 2025), as of 27 Nov 2026.
Where is it?
In Antaliya, Gandevi, Navsari, Gujarat.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 0.7 acres.
When was it filed?
The application was filed on 14 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Aug 2025 |
| Application filed | 14 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Sun Industries |
| Land area | 2,700 m² |
| Project cost | ₹1.7 crore |
| Village / locality | Antaliya |
| Taluk / tehsil | Gandevi |
| District | Navsari |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07132 |
In context
15 applications in Navsari since January 2022 are in the same category (Industry): 9 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.7 acres, this one is smaller than 87% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Antaliya, Gandevi, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0450 ha Protected forest land for Approach road for… — forest land use approved, 2.8 km away
- Diversion of 1.1790 Hectare of Protected Forest Land I.E. Road Side Strip… — lapsed, 3.1 km away
- 6 Inch Steel Gas Pipeline Connectivity to Industrial Customers M/S Balaji… — forest land use approved, 4.3 km away
- Proposed 50 KLPD Molasses /Sugarcane Juice/Sugar Syrup/Sugar based Distillery… — more information requested, 4.8 km away
- Diversion of 3.1076 Hectare of Canal and Road Side Strip Plantation Declared… — more information requested, 5 km away
- Diversion of 0.2337 Ha. of Protected Forest Land I.E. Road Side Strip… — more information requested, 5.1 km away
- 6 Inch Steel Gas Pipeline Connectivity to Industrial Customers M/S Balaji… — lapsed, 5.4 km away
- 90 mm Dia PE Gas Pipeline Connectivity for Dhanori to Manekpore & Avsar Villa… — forest land use approved, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.