Royal Billions is an approved residential project in Khoraj, Gandhinagar, Gujarat. It plans 84 units in 1 tower of up to 21 floors on 0.9 acres. Its stated project cost is ₹43.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 23 Jul 2025).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Royal Billions?

Royal Billions is an approved residential project in Khoraj, Gandhinagar, Gujarat. It plans 84 units in 1 tower of up to 21 floors on 0.9 acres.

Who is building it?

The applicant is Jigar Kiritbhai Patel.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 23 Jul 2025), as of 27 Nov 2026.

Where is it?

In Khoraj, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹43.2 crore and a site of 0.9 acres.

When was it filed?

The application was filed on 27 Feb 2025.

Project details

StatusEnvironmental approval granted
Status since23 Jul 2025
Application filed27 Feb 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantJigar Kiritbhai Patel
UseResidential
Units84
Towers1
Floors (tallest)21
Basements3
Height77 m
Parking spaces327
Land area3,500 m²
Built-up area36,377 m² (3,91,558 sq ft)
Plot area3,521 m² (37,900 sq ft)
Project cost₹43.2 crore
Village / localityKhoraj
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-07182

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 21 Apr 2026Under environmental review0.9 acres₹34.8 crore
New project filed 27 Feb 2025 (this page)Environmental approval granted0.9 acres₹43.2 crore

What the filings say

What is planned

According to the applicant's project reports and revised plans, Royal Billions is a commercial development proposed for Khoraj, Gandhinagar. While the project received an initial environmental approval in July 2025 for a 21-floor residential building with 84 units, the applicant has since filed for a revision to convert the project into a commercial complex.

The revised proposal consists of a single building with three basements, a ground floor, and 11 upper floors. The development is intended for commercial use (Mercantile-1) and includes the following components:

The project will provide a total of 272 units (12 shops and 260 offices). The total utilized Floor Space Index (FSI) area is planned at 14,106.51 square metres.

Layout and design

The building is designed with a maximum height of 76.88 metres, as per the previous environmental clearance. The site layout includes a common plot of 439.60 square metres (0.11 acres) and a peripheral margin of 8 metres to allow for vehicle movement.

Internal roads within the project are planned to be 8.18 metres wide. The design incorporates separate entry and exit points to manage traffic flow to the 18-metre wide approach road. The basements are designed with a height greater than 4.5 metres to accommodate potential future mechanical parking systems.

Land and surroundings

The project is situated on a 0.35-hectare (0.86-acre) site at Final Plot No. 17/1 of Town Planning Scheme No. 63 (Khoraj). The land is identified as Revenue Survey No. 455 (Original Plot No. 17). The site is bordered by Final Plot Nos. 144, 19/2, 18/1, and 12. The surrounding area is primarily designated for residential and commercial development.

Water, power and access

The total water requirement for the project is estimated at 99 kilolitres per day (KLD). The applicant proposes to source 58 KLD of fresh water from the local municipal authority, while the remaining 41 KLD will be met through treated sewage recycled for flushing and gardening.

The connected electrical load is projected at 816 kW. For emergency backup, a 125 kVA diesel generator set will be installed with acoustic enclosures. The applicant also proposes a rooftop solar power system with a capacity of 41 kW, meeting approximately 5% of the connected load.

Environmental safeguards

To manage liquid waste, an on-site Sewage Treatment Plant (STP) with a capacity of 85 KLD will be installed. Treated water will be reused within the premises via a dual plumbing system. Solid waste generation is estimated at 530 kg per day; biodegradable waste will be processed in an on-site organic waste converter, while recyclable materials will be sold to vendors.

For groundwater management, the applicant plans to install one percolation well for rainwater harvesting. The green belt will cover 712.62 square metres, including the plantation of 89 trees.

ItemDetail
Total Units272 (12 shops, 260 offices)
Building Configuration3 Basements + Ground + 11 Floors
Total FSI Area14,106.51 sq. m.
Parking Capacity327 Equivalent Car Spaces (CPS)
Fresh Water Demand58 KLD
STP Capacity85 KLD
Solar Power Capacity41 kW
Tree Plantation89 trees

Royal Billions site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Royal Billions: Site layout: building footprint, common plot, and internal roads (preview)🔒 Sign in free to see it
Site layout: building footprint, common plot, and internal roads
Royal Billions: Ground and 1st floor plans showing shop layouts and parking areas (preview)🔒 Sign in free to see it
Ground and 1st floor plans showing shop layouts and parking areas
Royal Billions: Typical office floor plans for the 2nd and 3rd floors (preview)🔒 Sign in free to see it
Typical office floor plans for the 2nd and 3rd floors
Royal Billions: Upper floor plans for the 10th and 11th levels (preview)🔒 Sign in free to see it
Upper floor plans for the 10th and 11th levels

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 92% of them.

124 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Khoraj, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.