What is Developing? Open the mapMap

LapsedIndustry · Gandhinagar, Gujarat

Amendment in the existing EC by M/s. Balaji Formalin Pvt. Ltd. located at Survey no. 1275 & 1274 (Old Survey no. 1398 & 1397), Near Rama Multi Tech Ltd., Moti Bhoyan, Ta. Kalol, Dist. Gandhinagar

Amendment in the existing EC by M/s. Balaji Formalin Pvt. Ltd. located at Survey no. 1275 & 1274 (Old Survey no. 1398 & 1397), Near Rama Multi Tech Ltd., Moti Bhoyan, Ta. Kalol, Dist. Gandhinagar is a lapsed industrial project in Bhoyan Moti, Kalol Gandhinagar, Gandhinagar, Gujarat. The site covers 2.2 acres. Its stated project cost is ₹23.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 24 Jan 2026).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Amendment in the existing EC by M/s. Balaji Formalin Pvt. Ltd. located at Survey no. 1275 & 1274 (Old Survey no. 1398 & 1397), Near Rama Multi Tech Ltd., Moti Bhoyan, Ta. Kalol, Dist. Gandhinagar is a lapsed industrial project in Bhoyan Moti, Kalol Gandhinagar, Gandhinagar, Gujarat. The site covers 2.2 acres.

Who is building it?

The applicant is Balaji Formalin Private Limited.

Has it been approved?

No. The application was lapsed on 24 Jan 2026, so it is no longer under consideration.

Where is it?

In Bhoyan Moti, Kalol Gandhinagar, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹23.2 crore and a site of 2.2 acres.

When was it filed?

The application was filed on 24 Dec 2025.

Project details

StatusLapsed
Status since24 Jan 2026
Application filed24 Dec 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantBalaji Formalin Private Limited
Land area2.2 acres (0.9 ha)
Project cost₹23.2 crore
Village / localityBhoyan Moti
Taluk / tehsilKalol Gandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-07234

In context

97 applications in Gandhinagar since January 2022 are in the same category (Industry): 70 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.2 acres, this one is larger than 69% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhoyan Moti, Kalol Gandhinagar, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Balaji Formalin projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.