Quick answers
What is Riva Central?
Riva Central is an approved commercial project in Shinay, Gandhidham, Kachchh, Gujarat. It plans 297 units in 1 tower of up to 2 floors on 3.3 acres.
Who is building it?
The applicant is Mogal Construction Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 May 2026), as of 27 Nov 2026.
Where is it?
In Shinay, Gandhidham, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹18.7 crore and a site of 3.3 acres.
When was it filed?
The application was filed on 21 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 May 2026 |
| Application filed | 21 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mogal Construction Private Limited |
| Use | Commercial |
| Units | 297 |
| Towers | 1 |
| Floors (tallest) | 2 |
| Basements | 1 |
| Parking spaces | 597 |
| Land area | 3.3 acres (1.3 ha) |
| Built-up area | 28,726 m² (3,09,204 sq ft) |
| Plot area | 17,400 m² (1,87,292 sq ft) |
| Project cost | ₹18.7 crore |
| Village / locality | Shinay |
| Taluk / tehsil | Gandhidham |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07291 |
In context
76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.3 acres, this one is smaller than 73% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shinay, Gandhidham, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ratilal Ravji Solanki-Meghpar — cleared for impact study, 3 km away
- Ravji Manji Sorathia (QL 7995) — lapsed, 3.6 km away
- Ravji Manji Sorathia (QL 9724) — lapsed, 3.6 km away
- Ravji Manji Sorathia (QL 8047) — lapsed, 3.6 km away
- Mining project by M/s Shree Ram Infrastructure Area-4.04.69 — under environmental review, 3.6 km away
- Babulal Devji Kapdi Block-F — environmental approval granted, 4 km away
- Babulal Devji Kapdi Block-F — cleared for impact study, 4 km away
- Ravji Manji Sorathia (QL 7915) — lapsed, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.