Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Jul 2025 |
| Application filed | 20 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Parth Rameshbhai patel |
| Use | Residential |
| Units | 199 |
| Towers | 2 |
| Floors (tallest) | 11 |
| Basements | 1 |
| Height | 40 m |
| Parking spaces | 445 |
| Land area | 1.2 acres (0.5 ha) |
| Built-up area | 24,427 m² (2,62,930 sq ft) |
| Plot area | 5,008 m² (53,906 sq ft) |
| Project cost | ₹58 crore |
| Village / locality | Bopal |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07328 |
What the filings say
What is planned
Parth Rameshbhai Patel proposes the construction of a residential affordable housing project named Kalav Montana in Bopal, Ahmadabad. The project is designed across five blocks (A, B, C, D, and E) with a total of 199 residential units. The buildings are planned to reach a maximum height of 11 floors above ground.
According to the project's area table, the development includes 120 units in Blocks A, B, and C, and 79 units in Blocks D and E. The residential units are categorized by size, including 160 units with a floor area between 50 and 66 square metres, and 39 units with a floor area between 66 and 90 square metres.
| Item | Detail |
|---|---|
| Total Units | 199 residential flats |
| Number of Blocks | 5 (A, B, C, D, and E) |
| Tallest Building | 11 floors (Ground + 10) |
| Basement Levels | 1 (for parking) |
| Total Built-up Area | 24,427.43 square metres |
| Total F.S.I. Area | 13,518.59 square metres |
| Parking Provision | Hollow plinth and basement |
Layout and design
The site layout features two distinct clusters of buildings. Blocks A, B, and C form one continuous structure, while Blocks D and E form a second cluster. The ground level is designed as a hollow plinth for parking, and a single basement level is provided for additional vehicle storage.
The internal design includes a 6.0-metre wide clear margin around the buildings to facilitate the movement of emergency vehicles. Two common plots are designated for open space, totaling 602.50 square metres. The project includes a 3.70-metre wide ramp with a 1:7 slope leading to the basement.
Water, power and access
During the operation phase, water will be sourced from the Ahmedabad Municipal Corporation (AMC). The applicant's environmental management plan (EMP) specifies the installation of a 150 kilolitres per day (KLD) sewage treatment plant (STP) using the activated sludge process. Treated wastewater will be reused for gardening and toilet flushing, with any excess discharged into the municipal drainage line.
Power will be supplied by the local utility, supported by a diesel generator (DG) set for emergency backup. Energy conservation measures include the installation of an 88 KW rooftop solar system and the use of LED lighting in common areas such as foyers and staircases. Access to the site is provided via a 12.0-metre wide Technical Planning Scheme (TPS) road.
Environmental safeguards
The project includes several mitigation measures to manage environmental impact:
- Air Quality: Peripheral barricading and water sprinkling will be used during construction to control dust. The DG set will be equipped with an acoustic enclosure and a stack of adequate height.
- Waste Management: Solid waste will be segregated into dry and wet waste. An organic waste converter (OWC) with a capacity of 250 kg per day will treat wet waste to produce compost for the greenbelt.
- Water Harvesting: Two rain water harvesting structures (percolation wells) are planned within the site to recharge the groundwater aquifer.
- Greenbelt: The applicant plans to plant 126 trees and develop lawn areas within the premises.
- Fire Safety: The buildings will be equipped with a fire protection system including fire extinguishers, a hydrant system, sprinklers, hose reels, and a fire alarm system as per National Building Code standards.
Timeline
The construction phase is expected to commence in 2025, following the grant of environmental clearance. The environmental management plan outlines capital expenditure for environmental measures across the 2024-25, 2025-26, and 2026-27 financial years.
Kalav Montana site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 70% of them.
282 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bopal, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Aaditya Two — environmental approval granted, 500 m away
- Kalav Skyline — environmental approval granted, 1000 m away
- Sakar Serenity — under environmental review, 1 km away
- Scarlet Harmony — under environmental review, 1 km away
- Skyora — environmental approval granted, 1.3 km away
- Advith Elegance — environmental approval granted, 1.5 km away
- Westin — environmental approval granted, 1.5 km away
- Aranyam — more information requested, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.