Quick answers
What is Shri Sameer Khalifa (Kothara Ordinary Sand Block- F)?
Shri Sameer Khalifa (Kothara Ordinary Sand Block- F) is a proposed mining project in Kothara, Abdasa, Kachchh, Gujarat. The site covers 3.7 acres.
Who is building it?
The applicant is Sameer Khalifa.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kothara, Abdasa, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 3.7 acres.
When was it filed?
The application was filed on 4 Oct 2025.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 31 Aug 2026 |
| Application filed | 4 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sameer Khalifa |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Kothara |
| Taluk / tehsil | Abdasa |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07354 |
In context
1,132 applications in Kachchh since January 2022 are in the same category (Mining): 683 approved, 276 filed or under review, and 173 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.7 acres, this one is smaller than 79% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Kothara, Abdasa, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Manish Singh — lapsed, 250 m away
- Approaches of 4 Lane Road Over Bridges and its approaches in lieu of Existing… — lapsed, 2.6 km away
- Proposed Roadside Protected Forest land of Naliya to Dumara Village — forest land use approved, 2.7 km away
- Proposed Road side Protected Forest land of Naliya to Dumara Village — lapsed, 3.2 km away
- Abuhoraira Jakariya Hingora. — lapsed, 3.9 km away
- Shri Darad Mamad Haji Sidhik — environmental approval granted, 4.1 km away
- Shri Darad Mamad Haji Sidhik — cleared for impact study, 4.1 km away
- Shri Padyar Hasan Haji (Kothara Block-M Ordinary Sand Mining Project at… — environmental approval granted, 5.1 km away
About this information