Cleared for impact studyIndustry · Surat, Gujarat

Proposed Standalone Grinding Unit for Cement Production Capacity of 6.0 Million TPA (2 x 3 Million TPA)" within the port limit of Adani Hazira Port Limited (AHPL) by M/s. Ambuja Concrete North Private Limited

Proposed Standalone Grinding Unit for Cement Production Capacity of 6.0 Million TPA (2 x 3 Million TPA)" within the port limit of Adani Hazira Port Limited (AHPL) by M/s. Ambuja Concrete North Private Limited is a proposed industrial project in Hajira, Chorasi, Surat, Gujarat. The site covers 13.7 acres. Its stated project cost is ₹1,080 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Aug 2025).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Standalone Grinding Unit for Cement Production Capacity of 6.0 Million TPA (2 x 3 Million TPA)" within the port limit of Adani Hazira Port Limited (AHPL) by M/s. Ambuja Concrete North Private Limited is a proposed industrial project in Hajira, Chorasi, Surat, Gujarat. The site covers 13.7 acres.

Who is building it?

The applicant is Ambuja Concrete North Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Aug 2025), as of 27 Nov 2026.

Where is it?

In Hajira, Chorasi, Surat, Gujarat.

How big is it?

It has a stated cost of ₹1,080 crore and a site of 13.7 acres.

When was it filed?

The application was filed on 28 Feb 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Standalone Grinding Unit for Cement Production Capacity of 6.0 Million TPA (2 x…

Project details

Official titleProposed Standalone Grinding Unit for Cement Production Capacity of 6.0 Million TPA (2 x 3 Million TPA)" within the port limit of Adani Hazira Port Limited (AHPL) at Village: Hazira Taluka: Chorasi, District: Surat, Gujarat by M/s. Ambuja Concrete North Private Limited.
StatusCleared for impact study
Status since13 Aug 2025
Application filed28 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAmbuja Concrete North Private Limited
Land area13.7 acres (5.6 ha)
Project cost₹1,080 crore
Village / localityHajira
Taluk / tehsilChorasi
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-07371

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 Mar 2026Environmental approval granted13.7 acres₹1,080 crore
Early planning filed 28 Feb 2025 (this page)Cleared for impact study13.7 acres₹1,080 crore

In context

103 applications in Surat since January 2022 are in the same category (Industry): 59 approved, 29 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 13.7 acres, this one is larger than 63% of them.

37 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hajira, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ambuja Concrete North Private Limited in Surat

3 Ambuja Concrete North projects in Surat
All 19 Ambuja Concrete North projects across India