Quick answers
What is MKC Infrastructure LTD (Haroda Blacktrap Block -Q)?
MKC Infrastructure LTD (Haroda Blacktrap Block -Q) is a proposed mining project in Haroda, Lakhpat, Kachchh, Gujarat. The site covers 4.9 acres.
Who is building it?
The applicant is Mkc Infrastructure Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Haroda, Lakhpat, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹9.8 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 17 Jul 2025.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 26 Oct 2026 |
| Application filed | 17 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mkc Infrastructure Limited |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹9.8 crore |
| Village / locality | Haroda |
| Taluk / tehsil | Lakhpat |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07373 |
In context
1,132 applications in Kachchh since January 2022 are in the same category (Mining): 683 approved, 276 filed or under review, and 173 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is smaller than 63% of them.
14 other mining leases have applied within 500 m of this site; together with this one they cover 81 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Haroda, Lakhpat, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Khasa Bhavesh Devkaran — environmental approval granted, 100 m away
- Khasa Bhavesh Devkaran — cleared for impact study, 100 m away
- Mining project by M/s. SHRI ASHISH KUMAR SINGH — environmental approval granted, 100 m away
- Mining project by M/s. SHRI ASHISH KUMAR SINGH — cleared for impact study, 100 m away
- Shri Ashish Kumar Singh (Haroda Black Trap Block- O) — under environmental review, 200 m away
- Mining project by M/s. SHRI ASHISH KUMAR SINGH — lapsed, 200 m away
- Mining project by M/s. ARUNKUMAR GOPAL CHHANGA (HARODA BLACK TRAP BLOCK - U) — environmental approval granted, 200 m away
- Mining project by M/s. ARUNKUMAR GOPAL CHHANGA (HARODA BLACK TRAP BLOCK - U) — cleared for impact study, 200 m away
More from Mkc Infrastructure Limited in Kachchh
- MKC Infrastructure Ltd. (Haroda Blacktrap Block - X) — under environmental review
- MKC Infrastructure LTD (Khambhala Blacktrap Block - 4) — cleared for impact study
- Mining project by Mkc Infrastructure Limited — environmental approval granted
4 Mkc Infrastructure projects in Kachchh
All 28 Mkc Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.