Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Aug 2025 |
| Application filed | 2 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Nilkanth Developers |
| Use | Mixed use |
| Units | 178 |
| Towers | 1 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Parking spaces | 252 |
| Land area | 3,300 m² |
| Built-up area | 22,207 m² (2,39,034 sq ft) |
| Plot area | 3,278 m² (35,284 sq ft) |
| Project cost | ₹22.1 crore |
| Village / locality | Hathijan |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07532 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 30 Dec 2025 | Environmental approval granted | 0.8 acres | ₹22.2 crore |
| New project filed 2 Jun 2025 (this page) | Environmental approval granted | 0.8 acres | ₹22.1 crore |
What the filings say
What is planned
Nilkanth Developers is developing Dharm Skyview, a mixed-use residential and commercial project in Hathijan, Ahmedabad. According to the applicant's layout plans and environmental clearance documents, the project consists of a single building divided into three blocks (A, B, and C) rising to a height of 44.94 metres (50.89 metres to the top floor).
The project includes 156 residential units and 22 commercial units. The blocks share a common configuration of two basement levels, a ground floor or hollow plinth, and 14 upper floors. The commercial units are located on the ground and first floors, while the residential units occupy the second floor through the fourteenth floor.
| Item | Detail |
|---|---|
| Total Units | 178 (156 Residential, 22 Commercial) |
| Number of Blocks | 3 |
| Tallest Building | 14 Floors + Ground + 2 Basements |
| Total Built-up Area | 22,206.84 sq. metres |
| Total FSI Area | 13,111.01 sq. metres |
| Common Plot Area | 329.83 sq. metres |
| Project Cost | ₹22.12 crore |
Layout and design
The ground floor is designed for both commercial shops and hollow plinth parking. Block A contains eight shops on the ground floor, while Blocks B and C are primarily dedicated to parking at this level. The first floor continues the commercial use with additional shops and residential units. From the second floor upwards, the layout is entirely residential.
Each block is served by two lifts, including one designated as a fire lift. The residential units are distributed across the floors as follows:
- Ground Floor: 8 commercial units
- 1st Floor: 7 commercial and 9 residential units
- 2nd Floor: 7 commercial and 12 residential units
- 3rd to 13th Floors: 12 residential units per floor
- 14th Floor: 6 residential units
Water, power and access
The total water requirement for the project is estimated at 123.77 kilolitres per day (KLD). Of this, 80.45 KLD will be fresh water sourced from a borewell, and 43.32 KLD will be recycled treated sewage for flushing and gardening. The project will generate approximately 98.22 KLD of sewage, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 150 KLD.
Power will be supplied by the local utility, with backup provided by three diesel generator sets (one 125 KVA and two 250 KVA). Access to the site is provided by a 60-metre wide Town Planning Scheme (TPS) road. Parking is distributed across the two basements, hollow plinth, and open areas, providing a total of 252 car parking spaces.
Environmental safeguards
The applicant proposes to develop a greenbelt of 411.78 sq. metres, which includes 81.95 sq. metres of tree-covered area with 82 trees. For water conservation, two percolation wells are planned for rainwater harvesting. Solid waste will be segregated at source, with biodegradable waste treated in an on-site Organic Waste Convertor (OWC) and recyclable materials sold to vendors.
Fire safety measures include an automatic sprinkler system in the basements, a 3,00,000-litre underground fire water tank, and a 60,000-litre overhead tank. Each floor will be equipped with fire extinguishers, hose reels, and a manually operated electric fire alarm system. A lightning arrestor will also be installed on the building.
Timeline
Environmental approval for the project was granted on 28 August 2025. The Corporate Environmental Responsibility (CER) activities, which include installing solar panels at a local school and distributing green and blue bins in Hathijan village, are scheduled to be completed within three years of the project's commencement.
Dharm Skyview site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.8 acres, this one is smaller than 95% of them.
131 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hathijan, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dharm Skyview — environmental approval granted, 0 m away
- Radhe Celestia — initial checks, 200 m away
- Veera Repose — under environmental review, 200 m away
- Viva Luxuria — environmental approval granted, 250 m away
- Viva Luxuria — environmental approval granted, 250 m away
- Radhe Elysium — environmental approval granted, 300 m away
- "Residential Cum Commercial Project – Mahavir Atulya" by SHREE KIRTI INFRA… — environmental approval granted, 450 m away
- Baghone Majestic — more information requested, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.