Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 May 2026 |
| Application filed | 29 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Pan Enterprise |
| Use | Residential |
| Units | 221 |
| Towers | 4 |
| Floors (tallest) | 14 |
| Basements | 1 |
| Parking spaces | 261 |
| Land area | 1.6 acres (0.6 ha) |
| Built-up area | 30,349 m² (3,26,674 sq ft) |
| Plot area | 6,374 m² (68,609 sq ft) |
| Project cost | ₹63.2 crore |
| Village / locality | Fatewadi |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07547 |
What the filings say
What is planned
Pan Enterprise proposes the construction of a residential project named Oyster Heights in Fatewadi, Ahmadabad. The applicant's project reports and architectural plans describe a development consisting of four residential blocks (Blocks A, B, C, and D) with a total of 221 units.
According to the floor area tables, the project includes the following components:
- Block A: 14 residential floors above a hollow plinth, containing 56 units.
- Block B & C: 14 residential floors above a hollow plinth, containing 109 units (8 units per floor for typical levels, reducing to 5 units on the 14th floor).
- Block D: 14 residential floors above a hollow plinth, containing 56 units.
The typical residential units are designed with drawing rooms, kitchens, dining areas, bedrooms, and attached balconies. The project also includes a basement level (1st Cellar) dedicated to parking, covering approximately 5,215.03 square metres.
Layout and design
The site layout shows the four blocks arranged linearly. Blocks A and D are positioned at the ends, while Blocks B and C are centrally located as an amalgamated structure. The ground level (hollow plinth) is primarily utilized for parking, equipment rooms, and electric meter rooms.
Internal access is provided by a 6.00-metre wide clear margin surrounding the buildings. The project includes two common plots for society members' use, totaling 1,872.36 square metres. A 6.79-metre wide ramp with a 1:7 slope provides access to the basement parking level.
Vertical circulation in each block is managed by two lifts (including one fire lift) and two staircases. The architectural plans specify a terrace level for each block containing stair cabins, lift machine rooms, and overhead water tanks.
Land and surroundings
The project is situated on amalgamated Final Plot (FP) No. 37 and 38 of Town Planning Scheme (TPS) No. 92/B (Sarkhej - Okaf). The total plot area is 0.64 hectares (1.58 acres). The site is bounded by an 18.00-metre wide TPS road. Surrounding land uses include social infrastructure to the north and garden space to the west.
Water, power and access
Water supply for the project is planned through underground and overhead storage tanks. The fire safety plan specifies an underground water tank with a capacity of 1,00,000 litres and a terrace-level tank of 20,000 litres.
Power requirements will be met through the local grid, with a dedicated substation area of 5.54 x 3.54 metres and space for a Diesel Generator (DG) set for emergency backup. Access to the site is provided via the 18.00-metre wide road with separate entry and exit points for residents.
Environmental safeguards
The applicant has proposed several environmental management features:
- Rainwater Harvesting: The plan includes two percolating wells and a collection trench system to recharge the aquifer.
- Waste Management: A community bin area is planned to accommodate 28 containers, based on a calculation of 10 litres per unit.
- Greenery: The layout specifies the plantation of 160 trees, meeting the requirement of 5 trees per 200 square metres of plot area.
- Renewable Energy: Space is reserved on the rooftops for solar energy installations and generation systems.
- Fire Safety: The buildings will be equipped with a hydrant system, fire alarms, extinguishers, and a fire lift in each block.
| Item | Detail |
|---|---|
| Total Units | 221 |
| Tallest Building | 14 Floors + Hollow Plinth |
| Basement Area | 5,215.03 sq. mt. |
| Common Plot Area | 1,872.36 sq. mt. |
| Tree Plantation | 160 trees |
| Percolation Wells | 2 |
| Total Built-up Area | 30,348.69 sq. mt. |
Oyster Heights site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is larger than 50% of them.
80 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Fatewadi, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tanaaz — environmental approval granted, 350 m away
- Akira 45 — environmental approval granted, 700 m away
- Proposed Residential Project - 'HAMD PACIFIC' — environmental approval granted, 750 m away
- Proposed Residential Project - "AL-HAMD PACIFIC-II" — environmental approval granted, 900 m away
- Al Noor — environmental approval granted, 1.1 km away
- Al Hoor — environmental approval granted, 1.1 km away
- Residential and Commercial Building Construction Project Namely "pehel Homes" — environmental approval granted, 1.5 km away
- Expansion of Blue Ocean (Residential and Commercial High-Rise Building… — environmental approval granted, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.