What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Gandhinagar, Gujarat

Nirvana Bunglows

Nirvana Bunglows is an approved residential project in Sargasan, Gandhinagar, Gujarat. It plans 50 units in 50 towers of up to 2 floors on 3.3 acres. Its stated project cost is ₹86.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 23 Feb 2026).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Nirvana Bunglows?

Nirvana Bunglows is an approved residential project in Sargasan, Gandhinagar, Gujarat. It plans 50 units in 50 towers of up to 2 floors on 3.3 acres.

Who is building it?

The applicant is Kailash Buildcon.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 23 Feb 2026), as of 27 Nov 2026.

Where is it?

In Sargasan, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹86.3 crore and a site of 3.3 acres.

When was it filed?

The application was filed on 14 Nov 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Nirvana Bunglows

Project details

StatusEnvironmental approval granted
Status since23 Feb 2026
Application filed14 Nov 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantKailash Buildcon
UseResidential
Units50
Towers50
Floors (tallest)2
Basements1
Parking spaces387
Land area3.3 acres (1.4 ha)
Built-up area24,604 m² (2,64,835 sq ft)
Plot area13,485 m² (1,45,151 sq ft)
Project cost₹86.3 crore
Village / localitySargasan
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-07649

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 9 May 2026Environmental approval granted3.3 acres₹86.3 crore
Ownership transfer filed 23 Apr 2026Lapsed3.3 acres₹86.3 crore
New project filed 14 Nov 2025 (this page)Environmental approval granted3.3 acres₹86.3 crore

What the filings say

What is planned

Kailash Buildcon has proposed a residential project named Nirvana Bunglows (later renamed Nirvann) in Sargasan, Gandhinagar. The applicant's project report and layout plans describe a development of 50 residential units across 50 individual blocks. The project is designed with a basement, a ground floor (or hollow plinth), and two upper floors, reaching a building height of 9.98 metres.

The residential units are categorized into several types based on their configuration and area:

According to the Environmental Clearance (EC) granted on 23 February 2026, the project has a total built-up area of 24,604.07 square metres and a Floor Space Index (FSI) area of 11,832.66 square metres.

Layout and design

The site layout features a central organized open space surrounded by internal roads. The project includes three common plots totaling 1,436.10 square metres. A 7.50-metre wide internal road provides access to the individual bungalows, while the site itself is bordered by 18.00-metre wide main roads.

The design incorporates a large basement of 11,322.75 square metres primarily for parking. The individual plot areas range from approximately 141 square metres to 264 square metres. The applicant has committed to a disabled-friendly design and the use of energy-efficient lighting and ventilation.

Land and surroundings

The project is situated on Final Plot No. 69 and 70 (Survey No. 231 and 232) within Town Planning Scheme No. 28 in Sargasan. The total plot area is 1.35 hectares (3.33 acres). The land use is designated as Residential Zone V. The surrounding area includes other residential developments and agricultural land, with Thakar Farm located nearby.

Water, power and access

During the operation phase, the total water requirement is estimated at 64.75 kilolitres per day (KLD). Of this, 39 KLD will be fresh water sourced via tankers, and 25.75 KLD will be met through treated sewage for flushing and gardening. A sewage treatment plant (STP) with a capacity of 60 KLD using Moving Bed Biofilm Reactor (MBBR) technology is planned.

Power will be supplied by the local grid, with a 100 KVA diesel generator set proposed for backup. The applicant plans to install 150 KW of solar power generation and use LED fixtures for energy conservation.

Parking is provided for 387 cars, with 11,322.75 square metres in the basement and 797.5 square metres in open areas. The plan includes electric charging points for 20% of the parking spaces.

Environmental safeguards

The applicant's Environment Management Plan (EMP) includes the development of a green belt covering 2,306.3 square metres, which includes 347 trees. For storm water management, three rainwater harvesting recharge wells are proposed.

Solid waste management involves segregating waste at the source. Biodegradable waste will be treated in an onsite organic waste converter, while recyclable materials will be sold to vendors. Non-recyclable garbage will be collected in nine community bins of 80-litre capacity for collection by the Gandhinagar Municipal Corporation.

Timeline

The project was granted environmental approval on 23 February 2026. A subsequent application was filed on 23 April 2026 to change the project name to "Nirvann." The Real Estate Regulatory Authority (RERA) registration for the project is valid until 31 October 2029.

Nirvana Bunglows site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Nirvana Bunglows: Site plan: 50 bungalow plots, internal roads, and common open spaces (preview)🔒 Sign in free to see it
Site plan: 50 bungalow plots, internal roads, and common open spaces
Nirvana Bunglows: Basement floor plan showing extensive car parking layout and ramps (preview)🔒 Sign in free to see it
Basement floor plan showing extensive car parking layout and ramps
Nirvana Bunglows: Building Type 3: Floor plans, front elevation and sectional diagram (preview)🔒 Sign in free to see it
Building Type 3: Floor plans, front elevation and sectional diagram
Nirvana Bunglows: Building Type 2: Layout including ground, first, and second floor plans (preview)🔒 Sign in free to see it
Building Type 2: Layout including ground, first, and second floor plans

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.3 acres, this one is larger than 91% of them.

202 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sargasan, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.