Quick answers
What is this project?
Proposed Expansion Project for the Manufacturing of Organic Azo Pigment & Pigment Paste Dispersions in existing unit by Hercules Pigments Pvt. Ltd. (Unit-I) is a proposed industrial project in Chharwada, Vapi, Valsad, Gujarat. The site covers 1.2 acres.
Who is building it?
The applicant is Hercules Pigments Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Apr 2025), as of 27 Nov 2026.
Where is it?
In Chharwada, Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹10 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 22 Apr 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Apr 2025 |
| Application filed | 22 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Hercules Pigments Private Limited |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹10 crore |
| Village / locality | Chharwada |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07818 |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.2 acres, this one is smaller than 63% of them.
224 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chharwada, Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion Project for the Manufacturing of Organic Azo Pigment &… — withdrawn, 0 m away
- APPLICATION FOR AMENDMENT IN EXISTING ENVIRONMENTAL CLEARANCE FOR SYNTHETIC… — returned to applicant, 100 m away
- Amendment in Environment Clearance for setting up manufacturing plant of… — returned to applicant, 150 m away
- Amendment in Environment Clearance for setting up manufacturing plant of… — returned to applicant, 150 m away
- Amendment in Environment Clearance for setting up manufacturing plant of… — returned to applicant, 150 m away
- Industrial project by M/s. Punagri Organics & Lifesciences Pvt. Ltd. — returned to applicant, 150 m away
- Industrial project by M/s. Punagri Organics & Lifesciences Pvt. Ltd. — lapsed, 150 m away
- Industrial project by M/s. Punagri Organics & Lifesciences Pvt. Ltd. — withdrawn, 150 m away
More from Hercules Pigments Private Limited in Valsad
- Proposed expansion project of manufacturing of Organic Azo Pigment & Pigment… — cleared for impact study
- Proposed Expansion Project for the Manufacturing of Organic Azo Pigment &… — withdrawn
All 3 Hercules Pigments projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.